My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-01-15_PERMIT FILE - M2015027
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2015027
>
2016-01-15_PERMIT FILE - M2015027
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:14:34 PM
Creation date
1/15/2016 2:41:34 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2015027
IBM Index Class Name
Permit File
Doc Date
1/15/2016
Doc Name
Response received 1-15-16
From
Steve Baker
To
DRMS
Email Name
ACY
GRM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
N) Dirt was mined prior to getting the llKMJ permit and was used fur the <br />bridge abutments. <br />6.3.4 <br />A) BLM has been contacted and reclamation will be dura at their <br />rewannendatiuns. Work in the barrow area will be dune upon approval of <br />llKMS permit, eury wurk is the riparian area will be done only ager approval <br />of AUUL 4U4 permit. <br />B) Fin5l grading will be done at dopes not steeper thm-, 3:1. <br />C) (i) No plant medium was salvaged at time of excavation. Existing soil will be <br />used and will be introduced with amendments to make higher quality. Any <br />topsoil from new disturbwice will be stockpiled as depicted on mining plan <br />map. lupsoil will be spread 6" - 8". Riparian areas will be treated in <br />accordance with the AUL)h 4u4 permit that is pending. <br />(ii) Seeding will be done in accordance with BLM stipulations. Viscing of soil <br />prior to seeding will be dune. Soil testing will be done to determinu the current <br />tertilizer to prumutc plant giuwth. <br />(iii) BLM recommendations will be followed for seeding of the uplzurd a<eas. <br />Sued for the riparian areas will be determined by the Auur; 4u4 permit that is <br />pending. <br />(v) BLM has been contacted and sccding will be dune under their <br />m,,vmmendations. <br />V) Access road a" Au site will be reduced to the original two track. The bridge will <br />be removed and replaced with the original culvert once the creek is realigned <br />to specitrcaions of the Ac;uL. <br />E) Any silt fence or other erosion uoutrol materials will be icmuved upun <br />,;Umpletiun of reclamation. Any seeded areas will be cuvered with straw after <br />seeding to prutcut frum wind and rain erosion. Any mulching done on site will <br />be 2 tuns per acro or will rrreet BLM standards. Creek realignment and <br />riparian area reclamation will be dune under the directiou of the ACOE and- <br />the <br />ndthe EPA under approved 4u4 permit that is currently pending and will be <br />pruvidud to the DRMS upon approval. weed spraying will ouuur thruughuut <br />the roclaamation. <br />
The URL can be used to link to this page
Your browser does not support the video tag.