My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-01-15_PERMIT FILE - M2015027
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2015027
>
2016-01-15_PERMIT FILE - M2015027
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:14:34 PM
Creation date
1/15/2016 2:41:34 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2015027
IBM Index Class Name
Permit File
Doc Date
1/15/2016
Doc Name
Response received 1-15-16
From
Steve Baker
To
DRMS
Email Name
ACY
GRM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6.3.2 <br />Amy Y eldell <br />DKMS <br />Grand Junction_ CO <br />xc: in ruspunse to you, letter dated 12/10/15 concerning the Velmnillion Lreuk <br />barrow arca r ilc N u. 1U n-Ul / <br />6.3.1 <br />1) Lucatiun of the main entr, nue to the situ is N40*46' 13.9463" and <br />w 1 UiS'FSU'4L.29Y.1''. <br />A) Please see NKUS printout for description of current vegetation on site. <br />13) There is a stockyard fence on located within ZUU feet of the boundary of the <br />sits uwn,,;d by permit applicant John Raftopoulos. <br />C) Desuription of Vemzm illiun tmuek aid it's alipuncnt rmnlnmg thruugh the pemnlit <br />area is under uunsidcratiun of the Army Curps of engineers and is currently in <br />the process of a 4U4 permit SLheduled for completion approx. January of ZU 16. <br />6.3.3 <br />A) rrupusud start date of reclamation is vecumber of An or upon approval of <br />permit proposed date of completion is June of ZU16. Keclamdqiun will be <br />completed over the entire 4.3 acre site upon approval of the 4U4 permit <br />,urrently under consideration of the Army Corps. Of Engineers. <br />B) Nu material was salvaged doming wiginal disturbauc;u. Existing soil will be <br />used and will be intruduuud with amendments to make higher duality. Any <br />topsoil from new disturbance will be stockpiled as depicted on mining plan <br />map. <br />E) Thi read depicted vn the map was existing and the bridge shown repla,.�d a <br />culvert that was existing. No uthur stru%tures wC�mc built on thu situ. <br />1') 1 he dimensions of the permitted area uuvers the barrow area plus miy area <br />that was filled with barrow area materi5I for the bridge abutments. <br />G) The existing road being used and there was a bridge constructed <br />to rvplQVG ai- existing vulvcxt. VGrmillivn VrvA was rvall6uGd and will be <br />restored under a pending 404 pemnlit fruln the Army Culps of Engineur-s. <br />1) Any impacts from the realignment of V ernnllion creek will be addressed <br />with the 4U4 permit from the Army torp of Engineers. <br />J) Army Corps of Engineers 4U4 permit is pending and work in the <br />11pC iii aiva will nut %,urmmunk v until pcllllit aappruval. <br />
The URL can be used to link to this page
Your browser does not support the video tag.