My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-02-15_HYDROLOGY - M2007044
DRMS
>
Day Forward
>
Hydrology
>
Minerals
>
M2007044
>
2010-02-15_HYDROLOGY - M2007044
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/4/2020 4:16:12 AM
Creation date
1/14/2016 4:33:11 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2007044
IBM Index Class Name
Hydrology
Doc Date
2/15/2010
Doc Name
Submittal of Jan. 2010 Discharge Monitoring Report
From
Energy Fuels Resources Corp
To
DRMS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
129
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r <br /> United States Department of the Interior <br /> BLJREAU OF LAND MANAGENIENT TAKE PRIDW <br /> Grand Junction Field Office INAMERICA <br /> 2815 H Rd <br /> Grand Junction,Colorado 81506 <br /> CO-130(3809) www.co.bim.gov/gira/gira.html <br /> October 17, 2007 <br /> Frank Filas <br /> Energy Fuels Corporation <br /> 44 Union Blvd., Suite 600 <br /> Lakewood, CO 80228 <br /> Re: Plan of Operations <br /> Whirlwind Mine <br /> Dear Mr. Filas: <br /> This office received the Plan of Operations(PO) for the Whirlwind Mine on July 5,2007. <br /> The PO proposes to expand the existing Whirlwind Tunnel and Packrat Mine into a <br /> combined underground uranium operation called the Whirlwind Mine. <br /> Based on our review under the BLM surface management regulations at 43 CFR <br /> 3809.401,we have determined that additional information must be submitted in order to <br /> make the PO adequate and complete. Please respond to the items below by providing an <br /> explanation and/or replacement updated section(s)of the PO. Also identify where the <br /> changes were made. <br /> 1. Freshwater source(Page 5-23). This indicates the freshwater source would be nearby <br /> springs or wells. However,the recent bulk sampling NOI says DP Spring will not be <br /> used. Specify your likely freshwater source. <br /> 2. Water treatment updates(various pages) -Update the PO to be consistent with <br /> changes made in the recently approved Whirlwind NOI modification, specifically related <br /> to changes in the design of water treatment facility, storage capacity, selenium treatment, <br /> and surface facilities(structures). <br /> 3. Bulkhead seals(Page 6-5). This addresses the proposed upper and lower bulkhead <br /> seals,but does not include any bulkhead design. Provide a conceptual design with <br /> illustrations as appropriate. <br /> 4. Bonding(Page 6-11). The bond needs adjusted for removal of metal tanks rather than <br /> pond backfill. <br />
The URL can be used to link to this page
Your browser does not support the video tag.