My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-02-15_HYDROLOGY - M2007044
DRMS
>
Day Forward
>
Hydrology
>
Minerals
>
M2007044
>
2010-02-15_HYDROLOGY - M2007044
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/4/2020 4:16:12 AM
Creation date
1/14/2016 4:33:11 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2007044
IBM Index Class Name
Hydrology
Doc Date
2/15/2010
Doc Name
Submittal of Jan. 2010 Discharge Monitoring Report
From
Energy Fuels Resources Corp
To
DRMS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
129
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 1 of 2 <br /> Bird, David <br /> From: Filas, Frank[f.filas@EnergyFuels.com] <br /> Sent: Monday, October 29, 2007 12:59 PM <br /> To: Means, Russ <br /> Cc: David_Gerwe@blm.gov; bruce_fowler@blm.gov; Bird, David; greg@lewicki.biz; Karmen King; <br /> tpierce@EnergyFuels.com; White, Dick <br /> Subject: RE: Plan of Operations, Whirlwind Mine <br /> Russ—Thanks for the schedule update. Items 1 and 2 will go directly to the BLM without copying DRMS. I will <br /> probably copy Jim Komatinsky at Mesa County on item 1 since the county could become involved if an accident <br /> were to occur on 5/10 Road or John Brown Road. <br /> Item 3 should not affect your review because we were drilling with mud rather than dry, so very little information <br /> could be collected on ground water conditions and I don't believe that any of this info changes the evaluation and <br /> conclusions reached in the submitted plans. <br /> With regard to the request for info on the water treatment system; I will submit an as-built report next week that <br /> will include a revised report by Lyntek that specifies tanks rather than ponds. I will also include a copy of our <br /> approved permit with DWQC. I would prefer to see this report released, as it better reflects what we are doing. <br /> No portion of this report will be considered confidential. <br /> Even though your review will not be completed until the 16th, I would prefer to wait until then to do the actual plan <br /> revisions. However, I may respond to BLM's comments in a letter so those issues are addressed for the ongoing <br /> EA. I know that DRMS's comments will affect the Plan of Operations as well as the 112d. For example, David Bird <br /> of DRMS is requesting additional information on seal locations while the BLM is requesting additional information <br /> on seal design. It only makes sense to include both of these additions in both the 112d and Plan of Ops since <br /> they are intertwined. <br /> Regards, Frank <br /> From: Means, Russ [maiIto:Russ.Means@state.co.us] <br /> Sent: Monday, October 29, 2007 10:46 AM <br /> To: Filas, Frank <br /> Cc: David_Gerwe@blm.gov <br /> Subject: RE: Plan of Operations, Whirlwind Mine <br /> Frank: <br /> We are working on our comments. I have several people working on different parts of the review currently. I <br /> need their input prior to releasing anything simply because several parts intertwine. I have a few and am starting <br /> to put it together but it may be the 16th before I have everyone's approval to release it. I'm hoping sooner, but <br /> there are several schedules on our end involved. There are a few things that should be noted: Items#1 and 2 <br /> below are non-jurisdictional and we will have no comment on them. An Emergency Response Plan on site will be <br /> looked at but not for off site transportation. The Division does not look at cumulative affects for proposed <br /> permits. One main reason is it requires subjective review on issues that may or may not ever occur. Our rules <br /> don't require such review at this time. #3 please define"evaluation" are we talking water quality, quantities, etc? <br /> We're looking at the data submitted but if there is additional information forth coming then it will require more <br /> review by the hydrologist and possibly others. One thing that will come up is a request from the Division to <br /> release details of the DRMS approved water treatment plant. I will need a letter authorizing the release of the <br /> information as it was approved under the NOI and is technically Confidential. It maybe a good idea to approve <br /> the release of any information under the NOI that EF doesn't consider proprietary. <br /> From: Filas, Frank [mailto:f.filas@EnergyFuels.com] <br /> 11/7/2007 <br />
The URL can be used to link to this page
Your browser does not support the video tag.