Laserfiche WebLink
.0 . <br /> ATTACHMENT A <br /> 1245: Continue with air lifting.Weather is now cold,cloudy with light snow. <br /> 1255: Purge water quality has improved with less silt content,but still turbid. Air lift purging continued with <br /> approximately 15 minute cycles(5 minutes of air lifting followed by 10 minutes of recovery). <br /> 1619: Final air lift conducted. Water quality is still turbid with small amounts of silt content. WWL collected <br /> sample of water to evaluate potential settling of suspended clay over time. GSD begins to rig down. <br /> 1725: GSD and WWL off site. <br /> Western Water&Land,Inc. Page 4 of 4 <br />