Laserfiche WebLink
ATTACHMENT A <br />CRIPPLE CREEK & VICTOR GOLD MINING Co. <br />ANGLOGOLD ASHANTI (COLORADO) <br />SQUAW GULCH (VLF) WEEKLY REPORT <br />Amec Foster Wheeler - 2015 CQA Field Staff Schedule MLE2 <br />0 <br />amec <br />foster <br />wheeler <br />Name <br />Sun <br />Mon <br />Tues <br />Wed <br />ThumFri <br />Sat <br />Dec 6 <br />Dec 7 <br />Dec 8 <br />Dec 9 <br />Dec 10 <br />Dec 11 <br />Dec 12 <br />Bobby Redd <br />PR <br />PR <br />PR <br />PR <br />PR <br />Ben Melly <br />GL <br />GL <br />GL <br />GL <br />GL <br />Tyler Browning <br />ST <br />GT <br />GT <br />GT <br />GT <br />Shawn Wisely <br />ST <br />ST <br />ST <br />ST <br />UG <br />Madeline Tarasar <br />ST <br />ST <br />ST <br />ST <br />ST <br />David Woolley <br />GT <br />ST <br />GT <br />GT <br />ST <br />Rod Bernuth <br />ST <br />ST <br />ST <br />ST <br />ST <br />Steve Rice <br />UG <br />UG <br />UG <br />UG <br />UG <br />Philemon Onyango <br />GT <br />Tony Dean <br />ST <br />ST <br />Dan South <br />ST <br />ST <br />ST <br />Joe Compton <br />ST <br />ST <br />Paul Malloy <br />ST <br />ST <br />Andrea Meduna <br />PE <br />LEGEND: <br />UM = Unit Manager <br />PM = Project Manager <br />PCE = Project Certifying Engineer <br />PE = Project Engineer <br />PR = Project Resident <br />LG = Lead Geosynthetics Engineer <br />LS = Lead Soils Technician <br />ST = Soil Technician <br />LT = Laboratory Technician <br />GL = Geosynthetics Lead <br />GT = Geosynthetics Technician <br />FLM= Field/Laboratory Manager <br />UG = Underground Working Remediation <br />SE = Senior Engineer <br />GS = Geophysics Survey Geologist <br />HY = Highway Design Engineer <br />WI = Welding Inspector <br />