My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-01-13_REPORT - M1980244
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2016-01-13_REPORT - M1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:14:31 PM
Creation date
1/14/2016 8:15:49 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REPORT
Doc Date
1/13/2016
Doc Name
CQA Report - Weeks ending 12/12/2015 & 12/19/2015
From
Newmont Mining Corporation / CC&V
To
DRMS
Email Name
TC1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CRIPPLE CREEK & VICTOR GOLD MINING Co. 4 <br />ANGLOGOLD ASHANTI (COLORADO) amec <br />SQUAW GULCH (VLF) WEEKLY REPORT foster <br />wheeler <br />CQA ACTIVITIES: <br />I) Field Activities: <br />The following activities were observed: Placement, compaction, density testing, depth verification and <br />acceptance of Soil Liner Fill materials; geomembrane installation and acceptance; Drain Cover Fill <br />placement; Spent Ore grading in PSSA; and pump monitoring at the LVSCS riser pipes. <br />II) Laboratory Activities: <br />Concrete testing (ADR2), atterberg limits, moisture, compaction, permeability and sieve analysis testing <br />continued. <br />The following samples were collected: <br />General Prosect Items <br />Meetings and Discussions: <br />Phase 1 — Drain Cover Fill; 1 -DCF -20-R <br />Phase 1— Drain Cover Fill; 1 -DCF -21-R <br />Cameron — Soil Liner Fill; SLF-205-C <br />The Weekly Contractor Meeting was held December 8, 2015 (Amec Foster Wheeler, CC&V, Ames). <br />Amec Foster Wheeler and CC&V discussed the barren pipeline corridor immediately following the Weekly <br />Contractor Meeting. <br />Ames daily safety meetings <br />> Amec Foster Wheeler daily safety meetings <br />Summary of Concerns: None. <br />CC&V: Daily updates, reporting, and scheduling occurred between CC&V Projects, Amec Foster <br />Wheeler, and Ames. <br />Deliveries: None. <br />CQA Monitor <br />Submitted by: <br />Bobby Redd, El <br />Project Resident <br />Reviewed by: <br />A4f/( <br />CC&V Projects <br />Reviewed By: Date: i A As <br />Date: December 16, 2015 <br />Date: <br />Reviewed By: Date: <br />
The URL can be used to link to this page
Your browser does not support the video tag.