Laserfiche WebLink
CRIPPLE CREEK & VICTOR GOLD MINING Co. 4 <br />ANGLOGOLD ASHANTI (COLORADO) amec <br />SQUAW GULCH (VLF) WEEKLY REPORT foster <br />wheeler <br />CQA ACTIVITIES: <br />I) Field Activities: <br />The following activities were observed: Placement, compaction, density testing, depth verification and <br />acceptance of Soil Liner Fill materials; geomembrane installation and acceptance; Drain Cover Fill <br />placement; Spent Ore grading in PSSA; and pump monitoring at the LVSCS riser pipes. <br />II) Laboratory Activities: <br />Concrete testing (ADR2), atterberg limits, moisture, compaction, permeability and sieve analysis testing <br />continued. <br />The following samples were collected: <br />General Prosect Items <br />Meetings and Discussions: <br />Phase 1 — Drain Cover Fill; 1 -DCF -20-R <br />Phase 1— Drain Cover Fill; 1 -DCF -21-R <br />Cameron — Soil Liner Fill; SLF-205-C <br />The Weekly Contractor Meeting was held December 8, 2015 (Amec Foster Wheeler, CC&V, Ames). <br />Amec Foster Wheeler and CC&V discussed the barren pipeline corridor immediately following the Weekly <br />Contractor Meeting. <br />Ames daily safety meetings <br />> Amec Foster Wheeler daily safety meetings <br />Summary of Concerns: None. <br />CC&V: Daily updates, reporting, and scheduling occurred between CC&V Projects, Amec Foster <br />Wheeler, and Ames. <br />Deliveries: None. <br />CQA Monitor <br />Submitted by: <br />Bobby Redd, El <br />Project Resident <br />Reviewed by: <br />A4f/( <br />CC&V Projects <br />Reviewed By: Date: i A As <br />Date: December 16, 2015 <br />Date: <br />Reviewed By: Date: <br />