My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-01-12_INSPECTION - C1996083
DRMS
>
Day Forward
>
Inspection
>
Coal
>
C1996083
>
2016-01-12_INSPECTION - C1996083
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:14:25 PM
Creation date
1/12/2016 10:34:18 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083
IBM Index Class Name
Inspection
Doc Date
1/12/2016
Doc Name
Inspection Report
From
DRMS
To
Bowie Resources, LLC
Inspection Date
1/5/2016
Email Name
JDM
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
January 5, 2016 C-1996-083/13owie No. 2 Mine JDM <br />requirement of Rule 4.10.4(4) for 0.2 acres of Gob Pile 91 where the slope was identified as being greater than 2:1. <br />Gob Pile #1 was snow covered. <br />Gob Pile 92 <br />Gob Pile 42 was snow covered with a heavy amount of snow. No activities were on-going during the inspection <br />due to the weather. Gob material had been windrowed in the area on the east side of the pile and was very stable <br />and snow covered with no issues. Snow had been removed near the area of windrowed material. <br />Gob Pile 93 <br />No material was being placed or moved at the time of the inspection. The pile was graded and snow covered. The <br />pile was stable with no evidence of instability or damage. TR -105 was recently approved by the Division to <br />expand the foot print of Gob Pile #3. <br />Gob Pile #4 <br />Reclamation of the west side of Gob Pile #4 is completed. Cover material is placed on the three lower benches <br />that have been backfilled and graded to final configuration. The upper bench remains open for additional refuse <br />placement. Topsoil has been placed and erosion control mat is in place. Gob Pile 44 was snow covered. <br />ROADS — Rule 4.03 Construction 4.03.1(3)/4.03.2(3) Drainage 4.03.1(4)/4.03.2(4) Surfacing and <br />Maintenance4.03.1(5) and (6)/4.03.2(5) and (6) Reclamation 4.03.1(7)/4.03.2(7): <br />All roads throughout the facilities area were snow packed at the time of the inspection with the exception of the <br />main facilities road and the access road to Gob Pile #2 had been recently cleared. The main facilities road was <br />plowed. No problems were noted and no evidence of instability was observed. <br />DOCUMENTS RECEIVED None <br />OTHER (SPECIFY) NA <br />Number of Partial Inspection this Fiscal Year: 5 <br />Number of Complete Inspections this Fiscal Year: 2 <br />Page 4 of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.