Laserfiche WebLink
January 5, 2016 C-1996-083/13owie No. 2 Mine JDM <br />k-1� <br />Pond C Pond D <br />Pond F Pond B <br />Pond K Pond J <br />Ditches and culverts were covered with a substantial amount of snow and appeared to be in stable condition <br />throughout the mine site, with no issues noted with the exception of the following: <br />- Ditch D -C4 located behind the stockpile conveyor above culvert C -C4 has been covered with plowed <br />snow. The plowed snow will need to be removed from the ditch to ensure functionality of D -C4. Bill Bear <br />of BRL noted that this maintenance item was noted and will be cleared. <br />PROCESSING WASTE/COAL MINE WASTE PILES — Rule 4.10 and 4.11 Drainage Control; Surface <br />Stabilization; Placement: <br />Gob Pile #I <br />Gob Pile #1 has been inactive. Technical Revision No. 97 was approved and provides a variance from the <br />Number of Partial Inspection this Fiscal Year: 5 <br />Number of Complete Inspections this Fiscal Year: 2 <br />Page 3 of 5 <br />