My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-01-11_REPORT - C1981038
DRMS
>
Day Forward
>
Report
>
Coal
>
C1981038
>
2016-01-11_REPORT - C1981038
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/29/2017 10:01:33 AM
Creation date
1/12/2016 7:07:09 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981038
IBM Index Class Name
Report
Doc Date
1/11/2016
From
Bowie Resources, LLC
To
DRMS
Annual Report Year
2015
Permit Index Doc Type
Annual Reclamation Report
Email Name
JDM
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2000 Reclamation Activities: <br />In November 2000, Bowie Resources began partial reclamation of the Bowie No. 1 East and <br />West Mines. A description of what was completed during this reporting period is as follows: <br />West Mine- Reclamation of the West Mine consisted of sealing three portals and backfilling with <br />25 feet of non-combustible material. Sealing ventilation shaft with 50 feet of non-combustible <br />material and removing all structures from the portal area. Partially removing some structures from <br />the fan site and begin restoring portal area back to approximate original contours. <br />East Mine - Reclamation of the East Mine consisted of removing some steel structures. During <br />this reporting period, only the steel shelter for the fuel station located on the office bench and the <br />lump bin located on crushing and screening level were completely demolished. Demolition of <br />transfer station #2, and crushing and screening facility was started but not completed during this <br />reporting period. <br />1999 Reclamation Activities: <br />No reclamation activities were undertaken at the Bowie No. 1 Mine during the 1999 calendar <br />year. The mine is currently idle due to economic reasons. Reclamation options are under <br />consideration. <br />1998 Reclamation Activities: <br />No reclamation activities were undertaken at the Bowie No. 1 Mine during the 1998 calendar <br />year. The mine is currently idle due to economic reasons. Reclamation options are under <br />consideration. <br />1997 Reclamation Activities: <br />No reclamation activities were undertaken at the Bowie No. 1 Mine during the 1997 calendar <br />year. The mine is currently idle due to economic reasons. Reclamation options are under <br />consideration. <br />1996 Reclamation Activities: <br />Reclamation in 1996 consisted of seeding and mulching a small area on the West Ridge <br />Refuse Pile. Area seeded was 0.1 acres. The mine is currently idle due to economic reasons. <br />Reclamation options are under consideration. <br />1995 Reclamation Activities: <br />No additional acreage was newly disturbed by mining or construction activity during the <br />1995 calendar year. Reclamation activities conducted included seeding and mulching operations on <br />the outslopes of the west ridge waste pile. (See locatoins37, exhibit 8). This area was seeded during <br />the month of December using permanent seed mix (mix no. 5 less shrub species). Also reseeded <br />during this period was a small area around the fan area using a temporary seed mix, (see table 6 for <br />seed mix). This area was also seeded during the month of December. <br />13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.