Laserfiche WebLink
2001 Reclamation Activities: <br />During the year 2001, the Bowie No. 1 West Mine continued to be reclaimed. At the end of <br />the 2001 reporting year, Bowie Resources Ltd. had completed approximately 80 percent of the <br />backfilling. Topsoil located on the fill outslopes was moved to a temporary storage location during <br />the backfilling process. The West Mine Ventilation Shaft was filled during this same period. <br />The Bowie East Mine reclamation during 2001 consisted of demolition and removal of <br />permanent structures. The following structures were removed; bathhouse/office, storage tanks, MCC <br />buildings, fire house, belt structures, transfer towers, shop/warehouse, tire shop, loading bin, fire <br />house, belt structure, the majority of the 2,000 ton bin, guard shack, sewage treatment plant, crushing <br />and screening plant, truck loadout, and stacking tube. <br />12 <br />- <br />A <br />WIWk <br />The Bowie East Mine reclamation during 2001 consisted of demolition and removal of <br />permanent structures. The following structures were removed; bathhouse/office, storage tanks, MCC <br />buildings, fire house, belt structures, transfer towers, shop/warehouse, tire shop, loading bin, fire <br />house, belt structure, the majority of the 2,000 ton bin, guard shack, sewage treatment plant, crushing <br />and screening plant, truck loadout, and stacking tube. <br />12 <br />