My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-01-07_REVISION - P2012003
DRMS
>
Day Forward
>
Revision
>
Prospect
>
P2012003
>
2016-01-07_REVISION - P2012003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 12:22:00 PM
Creation date
1/7/2016 4:23:21 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
P2012003
IBM Index Class Name
Revision
Doc Date
1/7/2016
Doc Name
Request SL01
From
Garth D. Cooke
To
DRMS
Type & Sequence
SL1
Email Name
SJM
GRM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 112 <br />Flard RocUmeldt Mining Rope 21 <br />an agreement, the Board may, without Rearing, order the Financial <br />Warrantor to provide an alternate foam of Financial Warranry. <br />I (4) At any such hearing, 4 the Boara finds that a Financial vvarranty has <br />been materially Impalred, It may order the Financial warrantor to provide <br />an alternate form of Financial Warranty. <br />'ij6j"' (5) A Financial Warrantor shall have ninety (au) days to piuvide an altaunate <br />warranty required unaur Rule 4.15(4). <br />1 ujor and 4 -ib RECEASE OF WARRANTIES - PROSPEUTIAG OPERATIONS <br />113ts' 4.1 vera r Application For Release of Warranties <br />(1) Opon the completion of reclamation, any person 'Rat filed with the Board <br />or Office a Prospecting Notice and Financial Warranties shall submit to <br />the Office by Cefiified Mail and separate from other types of <br />communication to the Board or Office a Reclamation Report and requesr <br />To, ieclamation responsibility release stating that reclamation is finished. <br /><<) S shall cornam; at a minimum: <br />as <br />() me or the operation, the name Of the operator, file number <br />of'Re Prospecting Notice of Intent and the name, mailing address <br />and vne number or tRe contact person; <br />(b)a .:1 ed statement by the Prospector Mat all reclamation <br />re irementS of the pro5peuting notice have been Satisfied; <br />(c) a narrative describing site grading, topsoil replacement, <br />suce ful levegetation and other Stabilization activities, as <br />a ropriate; <br />(d) s ' le photographs of the reclaimed area: and <br />(e) a map of suffic;ent detail to determine 'Re location ur the <br />Prospecting activity. <br />"i(s) (3) The Office shall, within [R;rty (30) days after receiving said report, or as <br />Soon thereafter as weather conditions permit, inspect the lantls and <br />reclamation described in the notice to detevmine if the Operator has <br />complied with all applicable requirements. <br />"'(') (4) If 'Re Office finds the reclamation to ba in compliance with the <br />
The URL can be used to link to this page
Your browser does not support the video tag.