Cripple Creek & Victor Gold Mining Company
<br />Cresson Project Amendment 11
<br /> 7
<br />
<br />Rule Number Brief Description of Rule Requirement Location in Application
<br />6.4.5(2)(e) Implementation Schedule for
<br />Reclamation
<br />Sec. 5, Project Description,
<br />Volume I
<br />6.4.5(2)(f) Grading, seeding, fertilizing,
<br />revegetation, topsoiling
<br />Sec. 12, Project Description,
<br />Volume I
<br />6.4.6(a) Topography during mining and
<br />reclamation
<br />Drawing C-4, Exhibit C and
<br />Drawing F-1, Exhibit F, Volume
<br />I
<br />6.4.6(b) Final land use Application Form, Sec. 12.1,
<br />Project Description, Volume I
<br />6.4.7(1) Effect on surface or groundwater Appendices 1, 2 and 10,
<br />Volumes II and IV, respectively
<br />6.4.7(2)(a) Map of water resources Drawings G-1 and G-1, Exhibit
<br />G, Volume I
<br />6.4.7(2)(b) Identify known aquifers Appendix, 1 and Appendix 2,
<br />Volume II
<br />6.4.7(2)(c) Dewatering and control of pollution Sec. 10, Project Description,
<br />Volume I
<br />6.4.7(3) Water requirements Sec. 6 and 7, Project
<br />Description, Volume I
<br />6.4.7(4) Water supply
<br />Sec. 9.3, Project Description,
<br />Volume I, Appendix 9, Volume
<br />IV
<br />6.4.7(5) Water Permits Exhibit M, Project Description,
<br />Volume I
<br />6.4.8(1)(a) Wildlife Resources on Affected Area
<br />Sec. 4.7, Project Description,
<br />Volume I, and Appendix 3,
<br />Volume III, Appendix 14,
<br />Volume IV
<br />6.4.8(1)(b) Seasonal use of area
<br />Sec. 4.7, Project Description,
<br />Volume I, and Appendix 3,
<br />Volume III, Appendix 14,
<br />Volume IV
<br />6.4.8(1)(c) Threatened or endangered species
<br />Sec. 4.7.1 and 4.9.1, Project
<br />Description, Volume I and
<br />Appendix 3, Volume III
<br />6.4.8.1(d) General effect on wildlife Sec. 4.7 and Appendix 3,
<br />Volume III
|