Laserfiche WebLink
Cripple Creek & Victor Gold Mining Company <br />Cresson Project Amendment 11 <br /> 6 <br /> <br /> <br />Rule Number Brief Description of Rule Requirement Location in Application <br />6.4.3(g) Man-made structures Drawing C-1a, Exhibit C, <br />Volume I <br />6.4.3(h) Soils Information <br />Sec. 4.8, Project Description, <br />Volume I, Appendix 3, Volume <br />III <br />6.4.4(a) Description of mining methods Sec. 5 of Project Description, <br />Volume I <br />6.4.4(b) Earthmoving Sec. 5, Project Description, <br />Volume I <br />6.4.4(c) Water diversions and impoundments <br />Sec. 5 and 10, project <br />Description, Volume I, <br />Appendix 10, Volume IV <br />6.4.4(d) Size of areas to be worked <br />Sec. 1.0 and 5.0, Project <br />Description, Volume I, Drawing <br />C-4, Exhibit C, Volume I <br />6.4.4(e) Timetable to describe the mining <br />operation <br />Sec. 5, Project Description, <br />Volume I, Drawings C-5, C-5a, <br />C-5b, Volume I <br />6.4.4(f) Deposit and stratum Sec 4.4, Project Description, <br />Volume I <br />6.4.4(g) Commodities and intended use Application Form <br />6.4.4(h) Incidental products Sec. 5, Project Description, <br />Volume I <br />6.4.4(i) Explosives Use Sec. 5, Project Description, <br />Volume I <br />6.4.5(1) Reclamation plan specificity and <br />flexibility <br />Sec. 12, Project Description, <br />Volume I <br />6.4.5(2)(a) Type of reclamation, acreage and <br />earthmoving <br />Sec. 12, Project Description, <br />Volume I <br />6.4.5(2)(b) Comparison of post mining land use Sec. 4.3 and 12, Project <br />Description, Volume I <br />6.4.5(2)(c) Compliance with Sec. 3.1 <br />Section 12, 13, Project <br />Description, Volume I and <br />Exhibit F-1 <br />6.4.5(2)(d) Plans for topsoil, species list and <br />seeding/planting rates <br />Sec. 4.8 and 12.3.3, Project <br />Description, Volume I