Laserfiche WebLink
Wagner/Kaufmann No. 3 SWSP Page 6 of 6 <br />December 21, 2015 <br />21 The decision of the state engineer shall have no precedential or evidentiary force, shall not <br />create any presumptions, shift the burden of proof, or serve as a defense in any pending <br />water court case or any other legal action that may be initiated concerning this plan. This <br />decision shall not bind the state engineer to act in a similar manner in any other applications <br />involving other plans, or in any proposed renewal of this plan, and shall not imply <br />concurrence with any findings of fact or conclusions of law contained herein, or with the <br />engineering methodologies used by the Applicant. <br />Please contact loana Comaniciu in Denver at (303) 866-3581, or Michael Hein in Greeley at <br />(970) 352-8712, if you have any questions concerning this approval. <br />Sincerely, <br />Jeff De. erage P.E. <br />Chief of Water Supply <br />Attachments: Tables 1, 4, and 5 <br />City of Loveland Lease <br />April 30, 2010 letter from DRMS <br />Accounting Protocol <br />cc: Michael Hein, Assistant Division Engineer, michael.hein@state.co.us <br />810 9th Street, Ste. 200, Greeley, CO 80631, (970) 352-8712 <br />Jean Lever, Water Commissioner, District 4, jean.lever@state.co.us <br />Division of Reclamation Mining and Safety <br />JD/TLK/idc: Wagner -Kauffman Pit #3 renewal (16) <br />