My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-12-21_REVISION - C1982056 (2)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1982056
>
2015-12-21_REVISION - C1982056 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:13:38 PM
Creation date
1/4/2016 2:35:50 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982056
IBM Index Class Name
Revision
Doc Date
12/21/2015
Doc Name
Adequacy Review No. 1
From
Twentymile Coal, LLC
To
DRMS
Type & Sequence
MR291
Email Name
JLE
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1/4/2016 State.co.us Executive Branch Mail - Fwd: Twentymile Coal, LLC - Foidel Creek Mine -MR 15-291 13 -Left OUtby Utility Borehole Completeness Response <br />The average soil thickness for soils unit D10 and 50E is 30 inches and 18 inches respectively. Given this, <br />the soils recovery plan does not appear to be adequate. Please revise the soils recovery and storage plan to <br />salvage all available topsoil. Please revise the above referenced pages accordingly. Also, please update <br />Table 49A with the revised estimate of topsoil to be salvaged. <br />3. The first paragraph of proposed revised page 2.05-106.1 does not follow with the paragraph from the <br />previous page. Please revise these pages for consistency. <br />Once I get the hard copy of your response, I will deem the application complete. Please let me know if you <br />have any questions. <br />Thanks, <br />Jared <br />On Fri, Dec 18, 2015 at 11:24 AM, Nettleton, Jerry <JNettleton@peabodyenergyocom> wrote: <br />Jared - <br />Attached is the response package (less maps) for the above -referenced MR. The hard -copy with maps will be <br />mailed -out today for your files. <br />Given the delays associated with obtaining the required cultural resource survey, we are very tight on our <br />schedule to get this work completed in order to meet our operational requirements. Therefore, any help you <br />can provide in expediting final review and approval will be greatly appreciated. If there are any additional <br />items that you identify in your final review, please let me know right away so we can respond immediately. <br />We appreciate your consideration and cooperation. If I don't talk with you between now and Christmas - Have <br />a wonderful and blessed holiday with family and friends - <br />Best regards, <br />Jerry <br />Jerry M. Nettleton <br />Manager Environmental Affairs <br />Twentymile Coal, LLC <br />29515 RCR27 <br />Oak Creek, Colorado 80467 <br />970.870.2712 <br />jnettleton@peabodyenergy.com <br />hftps://mail.google.com/mail/u/0/?ui=2&ik=e29129fcb5&vi ew=pt&search= i nbox&th=1520d4f5cb7c8O9b&si m 1= 1520d4f5cb7c809b 3/5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.