My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-12-21_REVISION - C1982056 (2)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1982056
>
2015-12-21_REVISION - C1982056 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:13:38 PM
Creation date
1/4/2016 2:35:50 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982056
IBM Index Class Name
Revision
Doc Date
12/21/2015
Doc Name
Adequacy Review No. 1
From
Twentymile Coal, LLC
To
DRMS
Type & Sequence
MR291
Email Name
JLE
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1/4/2016 State.co.us Executive Branch Mail - Fwd: Twentymile Coal, LLC - Foidel Creek Mine -MR 15-291 13 -Left OUtby Utility Borehole Completeness Response <br />Jerry <br />Jerry M. Nettleton <br />Manager Environmental Affairs <br />Twentymile Coal, LLC <br />29515 RCR27 <br />Oak Creek, Colorado 80467 <br />970.870.2712 <br />jnettleton@peabodyenergy.com <br />From: Ebert - DNR, Jared [mailto:jared.ebert@state.co.us] <br />Sent: Monday, December 21, 2015 4:18 PM <br />To: Nettleton, Jerry <br />Cc: Alysha Hernandez - DNR <br />Subject: Re: Twentymile Coal, LLC - Foidel Creek Mine - MR15-291 13 -Left OUtby Utility Borehole <br />Completeness Response <br />Jerry, <br />have not received the hard copy of your completeness review response with the necessary map, thus I have <br />not deemed the application complete. However, in order to expedite the process I have reviewed all of the <br />application material that I have received. Below are items that will need to be addressed prior to approval of <br />the MR291 application. <br />1. TC revised permit pages 2.04-9.1 and 9.2 with MR292. MR292 added a new section specifically for <br />the 13LT Outby Utility Borehole cultural resource survey. The originally proposed revised pages submitted <br />with MR291 did not take MR292 into account. Page 2.04-9.1 no longer needs to be revised, but page 2.04-9.2 <br />needs to be revised to add a discussion about the results of the cultural resource survey that was conducted <br />under the new section created for this project with MR292. <br />2. Proposed revised pages 2.05-45.29 and 2.05-84.13, indicates a maximum of 1.0 feet of soil material <br />from the road and pad disturbed area will be recovered and stockpiled. Based on Map 17 of the permit, the <br />new proposed road falls within a portion of soils unit 50E and D10 and the pad area falls within soil unit D10. <br />https://mail.googl e.com/m ai I/u/0/?ui=2&i k=e29129fcb5&view=pt&search= i nbox&th=152Od4f5cb7c8O9b&si m l=152Od4f5cb7c8O9b 2/5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.