My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-12-29_REVISION - M1976027
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1976027
>
2015-12-29_REVISION - M1976027
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 6:15:11 PM
Creation date
12/29/2015 4:28:40 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1976027
IBM Index Class Name
Revision
Doc Date
12/29/2015
Doc Name
Request TR03
From
Skanska USA
To
DRMS
Type & Sequence
TR3
Email Name
LJW
GRM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
of.00 <br />�dCOLORADO DIVISION OF RECLAMATION, MIMING AND SAFETY <br />* 1313 Sherman Street, Room 215, Denver, Colorado 80203 ph(303) 866-3567 <br />* 1876 " <br />REQUEST FOR TECHNICAL REVISION (TR) COVER SHEET <br />File No.: M1976-027 Site Name: Craig Pit <br />County La Plata TR# (DRMS Use only) <br />Permittee: Skanska USA Civil West Rnr.kxR03n+'in District, Inc. <br />Operator (If Other than Permittee): T esewilb <br />✓Complied! <br />Permittee Representative: Joe Schluter DEC 2 9 2015 <br />Violations Q�r <br />pry1SI0t� OF r � ..,CAMAII®M <br />Please provide a brief description of the proposed revision: . j, p : AFM <br />Phil Craig wants approximately 2 acres of reclaimed ground graveled, not topsoiled and <br />reclaimed area. <br />As defined by the Minerals Rules, a Technical Revision (TR) is: "a change in th� permit or application <br />which does not have more than a minor effect upon the approved or proposed Reclamation or <br />Environmental Protection Plan." The Division is charged with determining if tho revision as submitted <br />meets this definition. If the Division determines that the proposed revision is be} and the scope of a TR, <br />the Division may require the submittal of a permit amendment to make the requited or desired changes <br />to the permit. <br />The request for a TR is not considered "filed for review" until the appropriate fee is received by the <br />Division (as listed below by permit type). Please submit the appropriate fee with your request to <br />expedite the review process. After the TR is submitted with the appropriate fee, he Division will <br />determine if it is approvable within 30 days. If the Division requires additional ir formation to approve a <br />TR, you will be notified of specific deficiencies that will need to be addressed. I f at the end of the 30 <br />day review period there are still outstanding deficiencies, the Division must deny the TR unless the <br />permittee requests additional time, in writing, to provide the required information. <br />There is no pre -defined format for the submittal of a TR; however, it is up to the permittee to provide <br />sufficient information to the Division to approve the TR request, including updated mining and <br />reclamation plan maps that accurately depict the changes proposed in the requested TR. <br />Required Fees for Technical Revision by Permit Type - Please mark the correct fee and submit it with <br />your request for a Technical Revision. <br />Permit Type Required TR Fee Sub fitted (mark only one) <br />110c, 111, 112 construction <br />materials, and 112 quarries $216 2 <br />112 hard rock (not DMO) $175 Lel <br />110d, I I2d(1, 2 or 3) $1006 0 <br />
The URL can be used to link to this page
Your browser does not support the video tag.