My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-12-22_PERMIT FILE - C1984065
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1984065
>
2015-12-22_PERMIT FILE - C1984065
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:13:41 PM
Creation date
12/23/2015 9:18:44 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1984065
IBM Index Class Name
Permit File
Doc Date
12/22/2015
Doc Name
Colorado Discharge Permit System
Section_Exhibit Name
Appendix 4.7-8
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Appendix 4.7-8 <br />PART I <br />Page 8 of 31 <br />Permit No.: CO0048972 <br />Modification of any control measure as part of the corrective action required by the CORRECTIVE ACTIONS section <br />must be performed consistent with the CONTROL MEASURES section of this permit. <br />G. STORMWATER MANAGEMENT PLAN (SWMP) <br />1. General SWMP Requirements <br />The following administrative requirements apply to the SWMP written to address all drainage areas contributing <br />runoff to the outfalls referred to in this Part. The permittee shall develop a facility SWMP to comply with the <br />requirements of this permit within 90 days of the permit effective date. <br />a. SWMP requirement: The permittee must develop, implement, and maintain a SWMP. The SWMP shall be <br />prepared in accordance with good engineering, hydrologic and pollution control practices (the SWMP need <br />not be prepared by a registered engineer). The permittee must modify the SWMP to reflect current site <br />conditions. <br />b. Submission: The permittee must submit the SWMP to the Division if requested. <br />c. Signatory Requirements: The permittee must sign the SWMP in accordance with the REPORTING AND <br />RECORDKEEPING section; this requirement applies to the original SWMP prepared for the facility, and each <br />time the permittee modifies a SWMP. <br />d. Permit Retention: The permittee must maintain a copy of this permit with the SWMP. <br />e. SWMP Retention: The permittee must retain a copy of the SWMP at the facility unless another location, <br />specified by the permittee, is approved by the Division. <br />f. Consistency with Other Plans: The permittee may incorporate, by reference, applicable portions of plans <br />prepared for other purposes at their facility. Plans or portions of plans incorporated by reference into a <br />SWMP become enforceable requirements of this permit and must be available along with the SWMP. <br />g. Required SWMP Modifications: <br />i. Division initiated: <br />a) The permittee must modify the SWMP when notified by the Division that it does not meet one or <br />more of the requirements of this permit. Unless otherwise provided by the Division, the permittee <br />shall have 30 days after notification to make the necessary changes to the SWMP and implement <br />them. <br />b) The Division may require the permittee to submit the modified SWMP to the Division. <br />c) If the Division determines that the permittee's stormwater discharges do not, or may not, achieve <br />the effluent limits required by this permit, the Division may require the permittee, within a <br />specified time period, to develop and implement a supplemental control measure action plan, <br />which describes additional SWMP modifications to adequately address the identified water quality <br />concerns. <br />ii. Permittee initiated: <br />a) The permittee must modify the SWMP whenever necessary to address any of the triggering <br />conditions for corrective action in the CORRECTIVE ACTIONS section to ensure that they do not <br />reoccur. <br />b) The permittee must modify the SWMP whenever there is a change in design, construction, <br />operation, or maintenance at the facility that significantly changes the nature of pollutants <br />discharged in stormwater from the facility, significantly increases the quantity of pollutants <br />discharged, or that requires the permittee to implement new or modified control measures. <br />c) The SWMP modifications may include a schedule for control measure design and implementation, <br />provided that interim control measures needed to comply with the permit are documented in the <br />SWMP and implemented during the design period. <br />
The URL can be used to link to this page
Your browser does not support the video tag.