Laserfiche WebLink
Appendix 4.7-8 <br />PART I <br />Page 7 of 31 <br />Permit No.: C00048972 <br />F. CORRECTIVE ACTIONS <br />1. Conditions that must be Eliminated <br />If any of the following conditions occur within the drainage areas associated with the referenced outfalls at the <br />permitted facility (as identified by the permittee; the Division; or an EPA official, or local, or State entity), the <br />permittee must review and revise the selection, design, installation, and implementation of facility control <br />measures to ensure that the condition is eliminated and will not be repeated in the future: <br />a. an unauthorized release or discharge (e.g., spill, leak, or discharge of non-stormwater not authorized by a <br />CDPS permit) occurs; <br />b. facility control measures are not stringent enough for the discharge to meet applicable water quality <br />standards; <br />c. modifications to the facility control measures are necessary to meet the practice -based effluent limits in <br />this permit; or <br />d. the permittee finds in a facility inspection, that facility control measures are not properly selected, <br />designed, installed, operated or maintained. <br />2. Condition that Requires Review and Modification <br />If the following condition occurs, the permittee must review the selection, design, installation, and <br />implementation of facility control measures to determine the appropriate modifications necessary to attain the <br />effluent limits in this permit: <br />a. construction or a change in design, operation, or maintenance at the facility significantly changes the <br />nature of pollutants discharged in stormwater from the facility, or significantly increases the quantity of <br />pollutants discharged. <br />3. Corrective Action Reports and Deadlines <br />The permittee must document discovery of any condition listed in the INSPECTIONS section above, within 24 hours <br />and 5 days as described below, submit the documentation in an annual report as required in the REPORTING AND <br />RECORDKEEPING section, and retain a copy onsite with the facility SWMP as required in the STORMWATER <br />MANAGEMENT PLAN section. <br />a. 24 hour documentation requirement: <br />Within 24 hours of discovery of any condition listed in the INSPECTIONS section, the permittee must <br />document the following information: <br />i. Identification of the condition triggering the need for corrective action review; <br />ii. Description of the problem identified; and <br />iii. Date the problem was identified. <br />b. Five (5) day documentation requirement: <br />Within five (5) days of discovery of any condition listed in this section, the permittee must document the <br />following information: <br />i. Summary of corrective action taken or to be taken (or, for triggering events that require Review and <br />Modification and the permittee determines that corrective action is not necessary, the basis for this <br />determination); <br />ii. Notice of whether SWMP modifications are required as a result of this discovery or corrective action; <br />iii. Date corrective action initiated; and <br />iv. Date corrective action completed or expected to be completed. <br />4. Control measure modification <br />