Laserfiche WebLink
Appendix 4.7-8 <br />PART I <br />Page 11 of 31 <br />Permit No.: C00048972 <br />a) The date of any evaluation; <br />b) A description of the evaluation criteria used; <br />c) A list of the outfalls or onsite drainage points that were directly observed during the evaluation; <br />d) The different types of non-stormwater discharge(s) and source locations; and <br />e) The action(s) taken, such as a list of control measures used to eliminate unauthorized discharge(s), <br />if any were identified. <br />g. Inspection Procedures and Documentation: The permittee shall document inspection procedures, and <br />maintain such procedures and other documentation with the SWMP, as follows: <br />i. The permittee shall document procedures for performing the facility inspections required of the permit <br />(see INSPECTIONS). Procedures must identify: <br />a) Person(s) or positions of person(s) responsible for inspection; <br />b) Schedules for conducting inspections; and <br />c) Specific items to be covered by the inspection, including inspection schedules for specific outfalls. <br />ii. The permittee shall maintain inspection documentation with the SWMP as required by this permit. <br />h. Monitoring Procedures and Documentation: The permittee shall document monitoring procedures, and <br />maintain such procedures and other documentation with the SWMP, as follows: <br />i. The permittee shall document procedures for performing the monitoring required by the permit. <br />ii. For each type of monitoring, procedures must identify: <br />a) Locations where samples are collected, and outfall identification by its unique identifying number; <br />b) Staff responsible for conducting stormwater sampling; <br />c) Procedures for sample collection and handling, including any deviations from sampling within the <br />first 30 minutes of a measurable storm event; <br />d) Parameters for analysis, holding times and preservatives, analytical methods, and laboratory <br />quantitation levels; <br />e) Procedures for sending samples to a laboratory; <br />f) The numeric control values applicable to discharges from each outfall. <br />i. Corrective Action Documentation: The permittee must maintain a copy of all corrective actions <br />documentation for actions taken consistent with of this permit (see CORRECTIVE ACTIONS section) with the <br />facility SWMP. <br />H. REPORTING AND RECORDKEEPING <br />1. Annual Report: <br />ICIS Code <br />Description <br />Due date <br />Frequency <br />The permittee shall submit an annual report to the division for the reporting <br />March 1, <br />Annual <br />00308 <br />period January 1 through December 31 <br />2016 <br />a. The Annual Report shall include: <br />• Name of permittee, address, phone number <br />• Permit certification number <br />• Facility name and physical address <br />• Contact person name, title, and phone number <br />• Summary of inspection dates <br />• Corrective action documentation as required in the CORRECTIVE ACTON section and status of any <br />outstanding corrective action(s). <br />