Laserfiche WebLink
Cost Summary Worksheet Cont'd <br />Task # 000 <br />Page 7 of 9 <br />Operator Skill: <br />0.750 <br />(AVG.) <br />Material consistency: <br />1.000 <br />(CAT HB) <br />Dozing method: <br />1.000 <br />(GEN_) <br />Visibility: <br />1.000 <br />(AVG.) <br />Job efficiency: <br />0.830 <br />(1 SHIFT/DAY) <br />Spoil pile: <br />0.800 <br />(FND-RF) <br />Push gradient: <br />1.000 <br />(CAT HB) <br />Altitude: <br />1.000 <br />(CAT HB) <br />Material Weight: <br />0.793 <br />(CAT HB) <br />Blade type: <br />1.000 <br />(PAT) <br />Net correction: 0.3949 <br />Adjusted unit 66.98 LCY/hr <br />production: <br />Adjusted fleet 66.98 LCY/hr <br />production: <br />JOB TIME AND COST <br />Fleet size: 1 Dozer(s) <br />Unit cost: $1.159/LCY <br />Total job time: 23.99 Hours <br />Total job cost: $1,861 <br />CMCES Cost Estimating Software <br />