Laserfiche WebLink
BULLDOZER WORK <br />Task description: Rill/Gully maintenance, 3 times over 10 -years (Rule 3.02.1(7 <br />Site: Carbon Junction Mine Permit Action: 2015 Midterm Review Permit/Job#: C1992080 <br />PROJECT IDENTIFICATION <br />Task #: 004 <br />Date: 12/22/2015 <br />User: JDM <br />State: Colorado <br />County: La Plata <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />Basic Machine: <br />Cat D3K XL - 3P <br />Horsepower: <br />74 <br />Blade Type: <br />Power Angle Tilt <br />Attachment: <br />3 -shank ripper <br />Shift Basis: <br />1 per day <br />Data Source: <br />(CRG) <br />Cost Breakdown: <br />NA <br />Abbreviation: None <br />Filename: C080-004 <br />Loose volume: 1,607 LCY <br />Source of estimated volume: Permit Map 1 (100,000 sf x 1 ft)/(27 cf per yd) <br />Source of estimated swell DRMS Estimate <br />factor: <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjusted hourly <br />production: <br />50 feet <br />169.6 LCY/hr <br />Materials consistency description: Consolidated stockpile 1.0 <br />Average push <br />gradient: <br />Average site altitude: <br />Material weight: <br />0% <br />7,000 feet <br />2,900 lbs/LCY <br />Weight description: Decomposed rock - 50% Rock, 50% Earth <br />Job Condition Correction Factor Source <br />Utilization % <br />Ownership Cost/Hour: <br />$10.98 <br />NA <br />Operating Cost/Hour: <br />$28.61 <br />100 <br />Ripper op_ Cost/Hour: <br />$0.00 <br />0 <br />Operator Cost/Hour: <br />$38.01 <br />NA <br />Total unit Cost/Hour: 0 <br />Total Fleet Cost/Hour: $77.60 <br />MATERIAL QUANTITIES <br />Initial Volume: 1,208 <br />Swell factor: 1.330 <br />Loose volume: 1,607 LCY <br />Source of estimated volume: Permit Map 1 (100,000 sf x 1 ft)/(27 cf per yd) <br />Source of estimated swell DRMS Estimate <br />factor: <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjusted hourly <br />production: <br />50 feet <br />169.6 LCY/hr <br />Materials consistency description: Consolidated stockpile 1.0 <br />Average push <br />gradient: <br />Average site altitude: <br />Material weight: <br />0% <br />7,000 feet <br />2,900 lbs/LCY <br />Weight description: Decomposed rock - 50% Rock, 50% Earth <br />Job Condition Correction Factor Source <br />