Laserfiche WebLink
Cost Summary Worksheet Cont'd Task # 000 Page 4 of 5 <br />Task description: <br />Site: New Horizon Mine <br />PROJECT IDENTIFICATION <br />Task #: 002 <br />Date: 12/9/2015 <br />User: JDM <br />BULLDOZER WORK <br />Ditch C4A and Pond 18 East <br />Permit Action: TR69 <br />State: Colorado <br />County: Montrose <br />Permit/Job#: C1981008 <br />Abbreviation: None <br />Filename: C008-002 <br />Agency or organization name: Colorado Division of Reclamation, Mining and Safety <br />HOURLY EQUIPMENT COST <br />Basic Machine: <br />Cat D3K XL - 3P <br />Horsepower: <br />74 <br />Blade Type: <br />Power Angle Tilt <br />Attachment: <br />3 -shank ripper <br />Shift Basis: <br />1 per day <br />Data Source: <br />(CRG) <br />Cost Breakdown: <br />NA <br />Loose volume: 1,036 LCY <br />Source of estimated volume: Length from map 2.05.3-1, X -sec from Sec 2.05.3 <br />Source of estimated swell Cat Handbook <br />factor: <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjusted hourly <br />production: <br />50 feet <br />169.6 LCY/hr <br />Materials consistency description: Consolidated stockpile 1.0 <br />Average push <br />gradient: <br />Average site altitude: <br />Material weight: <br />0% <br />5,700 feet <br />2,900 lbs/LCY <br />Weight description: Decomposed rock - 50% Rock, 50% Earth <br />Job Condition Correction Factor Source <br />Operator Skill: 0.750 (AVG.) <br />CIRCES Cost Estimating Software <br />Utilization % <br />Ownership Cost/Hour: <br />$10.98 <br />NA <br />Operating Cost/Hour: <br />$28.61 <br />100 <br />Ripper op. Cost/Hour: <br />$0.00 <br />100 <br />Operator Cost/Hour: <br />$38.01 <br />NA <br />Total unit Cost/Hour: 0 <br />Total Fleet Cost/Hour: $77.60 <br />MATERIAL QUANTITIES <br />Initial Volume: 889 <br />Swell factor: 1.165 <br />Loose volume: 1,036 LCY <br />Source of estimated volume: Length from map 2.05.3-1, X -sec from Sec 2.05.3 <br />Source of estimated swell Cat Handbook <br />factor: <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjusted hourly <br />production: <br />50 feet <br />169.6 LCY/hr <br />Materials consistency description: Consolidated stockpile 1.0 <br />Average push <br />gradient: <br />Average site altitude: <br />Material weight: <br />0% <br />5,700 feet <br />2,900 lbs/LCY <br />Weight description: Decomposed rock - 50% Rock, 50% Earth <br />Job Condition Correction Factor Source <br />Operator Skill: 0.750 (AVG.) <br />CIRCES Cost Estimating Software <br />