Laserfiche WebLink
Cost Summary Worksheet Cont'd Task # 000 Page 3 of 5 <br />Material consistency: <br />Dozing method: <br />Visibility: <br />Job efficiency: <br />Spoil pile: <br />Push gradient: <br />Altitude: <br />Material Weight: <br />Blade type: <br />Adjusted unit <br />production: <br />Adjusted fleet <br />production: <br />0.900 <br />(CAT HB)) <br />1.000 <br />(GEN_) <br />1.000 <br />(AVG.) <br />0.830 <br />(1 SHIFT/DAY) <br />0.800 <br />(FND-RF) <br />1.000 <br />(CAT HB) <br />1.000 <br />(CAT HB) <br />0.793 <br />(CAT HB) <br />1.000 <br />(PAT) <br />Net correction: 0.3554 <br />JOB TIME AND COST <br />441.83 LCY/hr <br />441.83 LCY/hr <br />Fleet size: 1 Dozer(s) <br />Unit cost: $0.574/LCY <br />Total job time: <br />Total job cost: <br />17.67 Hours <br />$4,483 <br />CRCES Cost Estimating Software <br />