My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-08-11_PERMIT FILE - C1992080
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1992080
>
2015-08-11_PERMIT FILE - C1992080
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:09:51 PM
Creation date
12/8/2015 9:19:27 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1992080
IBM Index Class Name
Permit File
Doc Date
8/11/2015
Doc Name
Revised Permit Document
Section_Exhibit Name
Abridged Permit Document (PR-1)
Email Name
MLT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Topsoil Stockpile #2 <br />Topsoil Stockpile #2 was the source for replacement topsoil during the reclamation of the <br />North Pit, North Pit Haul Road, PRSA, and South Pit Drill Pad. It comprised 2.69 acres. <br />Reclamation of Topsoil Stockpile #2 involved the following tasks undertaken between <br />May and August 2006: <br />11) Loaded and hauled needed topsoil from the stockpile. This task was accomplished <br />with tracked excavator and articulated dump truck team. <br />2) Regraded and finish graded the area with a motor grader, leaving a base of eight to <br />twelve inches of topsoil. <br />4) Disked the topsoil. <br />5) Seeded and mulched the North Pit area as described in the revegetation plan. <br />South Pit Drill Pad <br />The South Pit Drill Pad was an area at the northwest corner of the South Pit that had been <br />leveled in advance of drilling and blasting. It comprised less than two acres. <br />Reclamation of the South Pit Drill Pad involved the following tasks undertaken between <br />May and August 2006: <br />1) Loaded and hauled needed fill from the Permanently Reclaimed Spoils Area. This <br />task was accomplished with tracked excavator and articulated dump truck team. <br />2) Regraded and fmish graded the area with a bulldozer. <br />3) Loaded and hauled topsoil from Topsoil Stockpile #2, covering the area with eight to <br />twelve inches of topsoil. <br />4) Regraded and spread the topsoil. <br />5) Seeded and mulched the South Pit Drill Pad area as described in the revegetation plan. <br />Equipment Area <br />The Equipment Area provided a storage area for parts and equipment. Approximately <br />1.6 acres were disturbed. <br />Reclamation of the Equipment Area involved the following tasks undertaken between <br />May and August 2006: <br />Abridged Permit Document 5-15 Permit Revision PROI 9/2014 <br />