My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-05-06_PERMIT FILE - C1992080A
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1992080A
>
2014-05-06_PERMIT FILE - C1992080A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:43:47 PM
Creation date
12/8/2015 9:01:17 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1992080A
IBM Index Class Name
Permit File
Doc Date
5/6/2014
Doc Name
Revised Permit Document
From
Oakridge Energy, Inc.
To
DRMS
Section_Exhibit Name
Abridged Permit Document (RN-4)
Email Name
MLT
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mulch <br />Mulching consistedof crimping hay orstraw into the soil at the same time seeding takes <br />place. Mulch wasappliedat the rate of 2.0 tons per acre. <br />Irrigation <br />No irrigation wasemployed during revegetationat the Carbon Junction Mine. <br />Weed and Pest Control <br />Noxious weeds have been and continue tobe controlled on the revegetated areas of the <br />mine site. Upon identification of an infestation, OEI will implement control measures. <br />Control measures will be implemented based on recommendations of the local NRCS or <br />agricultural extension office. OEI will modify the permit as necessary to address the <br />measures to be implemented. <br />Fertilization <br />No fertilization was employed during the revegetation of the Carbon Junction Mine. <br />Revegetation Success Criteria <br />The criterion for evaluation of revegetation success for the approved post-mining land <br />use is vegetation cover. This vegetation cover must be sufficient to control erosion. <br />Based on sampling at other mines sites in the area and the pre-mining vegetation studies, <br />a revegetation cover standard was established. <br />The following will be the revegetation success criteria for the Carbon Junction Mine: <br />Vegetation Cover <br />Vegetation cover of the reclaimed area willbe successful when vegetation cover is 40 <br />percent with 90 percent statistical confidence. <br />Herbaceous Production <br />There is no herbaceous production revegetation success standard. <br />Woody Plant Density <br />There is no woody plant density revegetation success standard. <br />Species Composition <br />There is no species composition revegetation success standard. <br />Abridged Permit Document 5-14 Permit Renewal RN04 4/2014 <br />
The URL can be used to link to this page
Your browser does not support the video tag.