Laserfiche WebLink
2.05.3(7) Coal Handling Structures <br />All coal handling structures were removed from the mine site or reclaimed during 2006. <br />2.05.3(8) Coal Processing Waste <br />Nocoal processing waste was produced by the Carbon Junction Mine. Waste coal was <br />confined to the North and South Pit and Equipment Yard. All waste coal was covered by <br />a minimum of four feet of non-toxic, non-combustible cover during final reclamation in <br />2006. <br />were <br />No slurry ponds or wash slurries proposed or constructed as a part of the mining in <br />this plan. No significant coal fines weregenerated as a part of the mining activity. No <br />pit dewatering took place during the life of the mine. <br />Settling Ponds <br />No coal settling ponds wereplanned or constructed for the Carbon Junctionoperations. <br />Backfilling of Processing Waste <br />No processing waste exists for disposal at the Carbon Junction Mine. <br />2.05.3(9) Underground Development Waste <br />The Carbon Junction Mine didnot produce any underground development waste. <br />2.05.3(10) Return of Coal Processing Waste to Abandoned Workings <br />The Carbon Junction Mine didnot return any coal processing waste to underground <br />workings. <br />Abridged Permit Document 5-6Permit Renewal RN04 4/2014 <br />