My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-12-07_GENERAL DOCUMENTS - M1974132
DRMS
>
Day Forward
>
General Documents
>
Minerals
>
M1974132
>
2015-12-07_GENERAL DOCUMENTS - M1974132
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:13:10 PM
Creation date
12/4/2015 3:17:42 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977132
IBM Index Class Name
GENERAL DOCUMENTS
Doc Date
12/7/2015
Doc Name
IMP CLOSEOUT FILE
From
DRMS
To
DRMS
Email Name
SDT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
120
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MINING PLAN <br />1. General Plan- Mining <br />EXHIBIT D <br />Up to the permit amendment in 2002, the original Berry Pit permit area consisted of approximately <br />50 acres. The gravel zone was approximately 20 feet thick and was overlain by soil and overburden <br />of 2-18 feet. The average thickness of soil/overburden was 12 feet. The topsoil/overburden was <br />stockpiled on the north side of the permit area as shown on Map C-2. This soil and overburden will <br />be used to reclaim the original permit area. The area was mined by first excavating soil/overburden <br />with scrapers or front end loaders and stockpiling the material on the north of the pit. The raw <br />gravel material was placed in a portable crusher/screen plant and various sizes of product were <br />made and placed in separate stockpiles. The 2002 amendment was made to allow mining of the <br />adjacent area to the south of the original area. This results in a total permit area of 91.21 acres. <br />The total disturbed area is 67.5 acres. The breakdown of this acreage given below is based on a <br />worst case disturbance for the life of the pit: <br />Area Description <br />Acreage <br />1. Soil/Overburden Stockpiles <br />4.5 <br />2. Processing area <br />8.0 <br />3. Product stockpile area <br />5.0 <br />4. Active Mining area (including topsoil stripping, active pit, roads) <br />28.0 <br />5. Fully reclaimed areas <br />10.0 <br />6. Partially reclaimed areas <br />12.0 <br />Total <br />67.5 <br />Dozers, loaders and trucks may be used to mine the gravel and haul it to the processing plant. This <br />plant consists of a portable rock crusher and screen plant to obtain the desired material sizes. Cer- <br />tain sizes may be used as feed for an on-site portable concrete plant and portable asphalt plant. Up <br />to 4 portable stacker conveyors are used to stockpile the various sizes of material. Processed mate- <br />rial is stored in stockpile areas as shown on Map C-2. Hot bituminous pavement made on site is not <br />Berry Pit 3/02 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.