My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-12-07_GENERAL DOCUMENTS - M1973007
DRMS
>
Day Forward
>
General Documents
>
Minerals
>
M1973007
>
2015-12-07_GENERAL DOCUMENTS - M1973007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/12/2020 1:40:07 AM
Creation date
12/4/2015 2:49:51 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1973007SG
IBM Index Class Name
General Documents
Doc Date
12/7/2015
Doc Name
IMP CLOSEOUT FILE
From
DRMS
To
DRMS
Email Name
SDT
Media Type
D
Archive
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
497
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1. Summary: <br /> a. Does the Reclamation Plan describe? (Y/N) <br /> i. Final Grading: ✓' G 3 <br /> ii. Seeding:✓ <br /> (nf PJv��'k�o iii. Fertilizing, t7ovt X L 5 <br /> 7 . Re-vegetation: ✓'-��uy� dc�aefv/�,v��cJ195 <br /> v. Topsoiling: v ' <br /> 2. Yes or No <br /> a. Does the operator give? <br /> 1. Type of reclamation: '^����� �� b`�C'1 <br /> 2. Why it was chosen:q&J, &V V' `Aj arau, . <br /> 0. Acreage Accorded to each: <br /> M Z ��¢� 4. Method of reclamation related to the mechanics of earthmoving: <br /> \v�2-OA '" C� �c14 L6v��E�' Y 5 W��� vw. V%� <br /> b. Is there good reason for the selected land use: Y 0`7 <br /> i. Does it match land use of surrounding area:✓U d <br /> ii. Is it in accordance with local land use plans and programs: �j , <br /> c. RULE 3.1 REQUIREMENTS: <br /> 1.) How will the land be reclaimed: <br /> a. Is it OKed by Landowner: W 'L <br /> 2.) Are they substituting any of the Affected land to be reclaimed by any other <br /> land they would like to reclaim? '-j 0 <br /> --� 3.) Do they say that they will finish reclaiming certain phases of the mine site five <br /> years after they began the reclamation process for the various phase? (Y® <br /> 4.) Will the public be allowed on the Mine Site? (Y/N) <br /> 5.) Reclamation Measures-Materials Handling: <br /> i. Is the final grading for the site appropriate for the final land <br /> use? 165 <br /> ii. Will Overburden and waste material be replaced into the mined <br /> area? <br /> 1. Will it be Compacted: <br /> 2. Will it prevent leaching of toxic or acidic material: <br /> iii. Will grading control erosion:� <br /> 1. Control Siltation \i Q`2 <br /> 2. Protect areas cLVtside of affected Land from slides or <br /> damges: \ QV <br /> iv. Is time table for backfilling and grading adequate for the <br /> operation: C5 <br /> v. Will all tox c and Acidic material be handled appropriately?iV/Pt <br /> r 1. Prevent Unsightliness: <br /> 2. Protect Drainage from pollution: <br /> vi. Will: <br /> p��� 1. Drill/Auger holes be plugged: <br />
The URL can be used to link to this page
Your browser does not support the video tag.