Laserfiche WebLink
iii. Sequential outline of each phase: <br /> f. Product Material Information: <br /> i. Info on Deposit: <br /> 1. Nature: 5Ck; -, <br /> 2. depth: -z� - (u"— ( I <br /> 3. Thickness: 7-0 , glow sum 4e�v5 4 <br /> 4. Overburden type: <br /> ii. Info on Stratum Beneath the deposit: <br /> 1. Nature of Stratum: PAe�f Sv\Gk'� <br /> g. Identify different commodities to be mined: <br /> i. Primary : u vi G <br /> 1. End Use: �J <br /> ii Secondary Commodities: <br /> 1. End Use: <br /> h. Have they named and described the end use of any incidental products that <br /> they may find. <br /> i. Will they be using explosives? (Y/N) <br /> i. They must have a statement in this section stating if explosives <br /> will be used or not. <br /> ii. If yes: Must have a geotechnical stability exhibit: <br /> iii. Will any off site areas be affected: <br /> j. Will there be a processing plant or site? IV 0 <br /> i. Must be located on the map <br /> ii. They need to describe how surface and ground water will <br /> protected. <br /> iii. Within their reclamation cost section, they must account for how <br /> much it would cost to remove the facility? <br /> k. Will a slurry wall be put in place?.✓V'0 <br /> i. They must provide details on the design of the wall. <br /> ii. Ask how wells, permanent man made structures will be impacted <br /> from Mounding or Drawdown from the slurry wall? <br /> 1. Will they be dewatering the pit? -A) 0 <br /> i. They need to account for any impacts to the water quantity in the <br /> surrounding area: <br /> 1. How will it impact surrounding man made structures like <br /> wells. <br /> in. Compare Permit Application page and the mining plan to ensure the <br /> permit area are the same in both sections. <br /> n. Will the operator be making n5w roads in the permit area and or will they <br /> be using any existing roads? <br /> i. They need to specify the road dimensions and they must be <br /> included in the permit area. <br /> ii. They need to describe any improvements that will make to the <br /> existing roads. <br /> EXHIBIT E—Reclamation Plan <br />