RECLAMATION PLAN <br /> (The following paragraphs have been deleted because they primarily revolve around the original <br /> option of constructing a new reservoir in this area. Those plans have now been abandoned. <br /> Therefore, these discussions are no longer relevant. However, the issue of blending this site <br /> through the Fountain Mutual Ditch corridor is still relevant and will be discussed in a later <br /> section pertaining to blending this area with the rest of the pit.) <br /> ditch,if the ditch is relocated and the adjacent Phase 5e is niined, this "teniporaryl' slope w <br /> be renioveji, but only if no reservoir is constructed in the Little johnson area. Thus, t <br /> "temporary" slope must be reclaitned as though it is the final slope. This is necessary <br /> because the construction of a reservoir in the Little iohnson area is the most finliting final land <br /> use, that is, the use that requires this material be present. All other uses en-visioned for diis area <br /> would probabfy not require tffis inaterial to be in place and would alfow retroval of the san <br /> under the ditch after the ditch is relocated. <br /> hi eff-ect, at the end of the hittle john is safe to assunie that the Fountai <br /> Nlutual Ditch wflf still be in its current location and a decision as to the creation of a V%jil, <br /> will not i-fave been niade. Until the ditch is iroved ti-fis material must remain in place, irrespective <br /> of Whethel. a MSM V011 is created or rtot, because the ditch route flows across the top of <br /> niateriah But the ditch also extends ffirther to the west between Phase 5c atid the phases to the <br /> south of the ditch. Furthenrore, the current plan anticipates the ditefi being refocated at sonie <br /> point and the sand tinder the ditch corridor rernoved. Therefore, to acconnnodate the <br /> niaterial tinder the ditch cart be renioved unfif such titne as the ditch is nioved to a different <br /> focation. This is already provided for in the existing pernift. <br /> But in the Little johnson area an additional consideration ninst be taken into account. T! <br /> Little jofnison area niay eventnaify be retunied tO a voir. This is an expressed desire of the <br /> landowner of the hittle johnson area. Therefbre, the niaterial on the south side of the current <br /> ditch corridor (north side of the fittle johnson area) niust remain in place, whether the ditch is <br /> moved or not, until such firne as it is decided whether the reservoir will be niaterial on the sonth side of the ditch corridor nIuSt ICITIam until the ditch is nioved. None of the <br /> ff the reservoir is created then the final configuration of the Daniefs Sand Pit sfopes wiff <br /> return to a pattern higlify similar to the currently perniftted patteni. But, if the reservoir is not <br /> created, then the final configuration of the Daniels Sand Pit will be according to tile contours <br /> shown on the niaps in Exhibit F of this amendnient. hi that case, the inaterial under the current <br /> ditch focation will be renioved and a inore gentle transition ftoni the east end of Phase 4e to the <br /> cast end of Phase 5e will occur. <br /> fz�nfif the ditch is nioved and a decision regarding the reser-voir is made, the reclanlation <br /> of the south side of the ditch corridor in the Little johnson area only nittst be considered <br /> Daniels Sand Pit Amendment (2008) Exhibit E Page 6 of 22 <br />