My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-12-04_GENERAL DOCUMENTS - M1977036
DRMS
>
Day Forward
>
General Documents
>
Minerals
>
M1977036
>
2015-12-04_GENERAL DOCUMENTS - M1977036
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/12/2020 12:49:49 AM
Creation date
12/4/2015 10:33:58 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977036
IBM Index Class Name
General Documents
Doc Date
12/4/2015
Doc Name
IMP CLOSEOUT FILE
From
DRMS
To
DRMS
Email Name
SDT
Media Type
D
Archive
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
479
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COST SUMMARY WORK <br /> Task description: Addition of Slurry Wall Costs to Current Bond Estimate <br /> Permit Action: Martin Marietta SO-02 <br /> Site: Greeley 35th Ave Pit Slurry Wall Estimate Permit/Job#: M1977036 <br /> PROJECT IDENTIFICATION <br /> Task#: 000 State: Colorado Abbreviation: None <br /> Date: 3/29/2012 County: Weld Filename: M036-000 <br /> User: PSH <br /> Agency or organization name: DRMS <br /> TASK LIST(DIRECT COSTS) <br /> Task Form Fleet Task <br /> Description Used Size Hours Cost <br /> 001 Current Bond Amount NA 1 1.00 $967,789.00 <br /> 002 Install Slurry Wall(22,950'L x 38'D x$3.00 LF) NA 1 1.00 $2,616,300.00 <br /> SUBTOTALS: 2 $3,584,089.00 <br /> INDIRECT COSTS <br /> OVERHEAD AND PROFIT: <br /> Liability insurance: 2.02 Total= $72,398.60 <br /> Performance bond: 1.05 Total= $37,632.93 <br /> Job superintendent: 180.00 Total= $10,674.00 <br /> Profit: 10.00 Total= $358,408.90 <br /> TOTAL O&P= $479,114.43 <br /> CONTRACT AMOUNT(direct+O&P)= $4,063,203.43 <br /> LEGAL-ENGINEERING-PROJECT MANAGEMENT: <br /> Financial warranty processing(legal/related costs): 0.00 Total= 0.00 <br /> Engineering work and/or contract/bid preparation: 4.25 Total= $172,686.15 <br /> Reclamation management and/or administration: 5.00 $203,160.17 <br /> CONTINGENCY: 3.00 Total= $107,522.67 <br /> TOTAL INDIRECT COST= $962,483.42 <br /> TOTAL BOND AMOUNT(direct+indirect)= $ ,5^ 4n <br /> $495469572.00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.