My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-11-30_REVISION - M1976018 (3)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1976018
>
2015-11-30_REVISION - M1976018 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 11:44:32 AM
Creation date
12/3/2015 4:20:11 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1976018
IBM Index Class Name
REVISION
Doc Date
11/30/2015
Doc Name
Bond Estimate SI02
From
North Weld Gravel
To
DRMS
Type & Sequence
SI2
Email Name
PSH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Scraper Worksheet Cont'd Task # 502 <br />Cycle Time: <br />Scraper Loading Time: <br />Maneuver and Spread Time: <br />Job Condition Correction: <br />0.70 Minutes <br />0.60 Minutes <br />Net Correction: <br />0.830 <br />NA <br />Page 2 of 2 <br />Site Altitude: 5060 feet <br />Travel Time: <br />Road Condition: Firm, smooth, rolling, dirt/It. surfaced, watered, maintained 3.0 <br />Haul Route: <br />Seg # <br />Scraper <br />Push Dozer <br />Source <br />Altitude Adj: <br />1.000 <br />NA <br />(CAT HB) <br />Job Efficiency: <br />0.830 <br />NA <br />(CAT HB) <br />Net Correction: <br />0.830 <br />NA <br />Page 2 of 2 <br />Site Altitude: 5060 feet <br />Travel Time: <br />Road Condition: Firm, smooth, rolling, dirt/It. surfaced, watered, maintained 3.0 <br />Haul Route: <br />Seg # <br />Haul Distance (Ft) <br />Grade <br />Roll. Res <br />Total Res <br />Velocity (fpm) <br />Travel Time <br />(%) <br />(%) <br />(%) <br />(min) <br />1 <br />500.00 <br />15.00 <br />3.00 <br />18.00 <br />600 <br />0.84 <br />Haul Time: 0.84 minutes <br />Return Route: <br />Seg # <br />Haul Distance (Ft) <br />Grade <br />Roll. Res <br />Total Res <br />Velocity (fpm) <br />Travel Time <br />%) <br />% <br />(%) <br />(min) <br />1 <br />500.00 <br />-15.00 <br />3.00 <br />-12.00 <br />1749 <br />0.38 <br />Return Time: <br />0.38 minutes <br />Total Scraper team cycle time: 2.52 minutes <br />Adjusted for job conditions: 372.51 LCY/Hour <br />Selected Number of Scrapers: 2 Scraper(s) <br />Adjusted single scraper team (unit) hourly production: 745.02 LCY/Hour <br />Adjusted multiple scraper team (fleet) hourly production: 745.02 LCY/Hour <br />Unadjusted unit production/hour: 448.81 LCY/Hour <br />Optimal Number of Scrapers per push dozer: <br />JOB TIME AND COST <br />Fleet size: 1 Team(s) Total job time: 21.65 Hours <br />Unit cost: $0.835 /LCY Total job cost: $13,479 <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.