Laserfiche WebLink
Scraper Worksheet Cont'd <br />Task description: <br />Site: North Weld Gravel <br />Task # 502 <br />SCRAPER TEAM WORK <br />Replacing Topsoil - Phase 1 <br />Page 1 of 2 <br />PROJECT IDENTIFICATION <br />Task #: <br />Date: <br />User: <br />Permit Action: SI -02 Bond Estimate Permit/Job#: M1976018 <br />502 State: Colorado <br />11/30/2015 County: Weld <br />PSH <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT <br />Abbreviation: None <br />Filename: MO18-502 <br />-Scraper: <br />-Dozer: <br />COSTShift basis: 1 per day <br />Equipment Description <br />Cat 627G <br />NA <br />Support Equipment -Load Area: <br />-Dump Area: <br />NA <br />NA <br />Road Maintenance —Motor Grader: <br />-Water Truck: <br />NA <br />Water Tanker, 2,500 Gal. <br />Cost Breakdown: <br />Scraper Work Team <br />Support Equipment <br />Maintenance Eauinment <br />Total work team cost/hour: $622.45 <br />MATERIAL QUANTITIES <br />Initial volume: 16,133 <br />Loose volume: 16,133 <br />Source of estimated volume: <br />CCY <br />LCY <br />Swell factor: 1.000 <br />Division of Reclamation, Mining & Safety <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Material weight: <br />Material description: <br />Rated Payload: <br />Payload Capacity: <br />1,600 lbs/LCY <br />Top Soil <br />52,800 pounds <br />33.00 LCY <br />Scraper Bowl (volume) Basis: <br />Struck Volume: <br />Heaped Volume: <br />Average Volume: <br />Adjusted Capacity: <br />15.70 <br />22.00 <br />18.85 <br />18.85 <br />LCY <br />LCY <br />LCY <br />LCY <br />CIRCES Cost Estimating Software <br />Scraper <br />Dozer <br />Load Area <br />Dump Area <br />Motor Grader <br />Water Truck <br />%Utilization -machine: <br />100 <br />NA <br />NA <br />NA <br />NA <br />20 <br />Ownership cost/hour: <br />$69.99 <br />NA <br />NA <br />NA <br />NA <br />$7.43 <br />Operating cost/hour: <br />$183.48 <br />NA <br />NA <br />NA <br />NA <br />$4.42 <br />Ripper op. cost/hour: <br />NA <br />NA <br />NA <br />NA <br />NA <br />$0.00 <br />Operator cost/hour: <br />$39.02 <br />NA <br />NA <br />NA <br />NA <br />$25.61 <br />Unit Subtotals: <br />$292.49 <br />NA <br />NA <br />NA <br />NA <br />$37.47 <br />Number of Units: <br />2 <br />0 <br />0 <br />0 <br />0 <br />1 <br />Group Subtotals: <br />Work: <br />r $584.98 <br />Support: <br />$0.00 <br />Maint: <br />$37.47 <br />Total work team cost/hour: $622.45 <br />MATERIAL QUANTITIES <br />Initial volume: 16,133 <br />Loose volume: 16,133 <br />Source of estimated volume: <br />CCY <br />LCY <br />Swell factor: 1.000 <br />Division of Reclamation, Mining & Safety <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Material weight: <br />Material description: <br />Rated Payload: <br />Payload Capacity: <br />1,600 lbs/LCY <br />Top Soil <br />52,800 pounds <br />33.00 LCY <br />Scraper Bowl (volume) Basis: <br />Struck Volume: <br />Heaped Volume: <br />Average Volume: <br />Adjusted Capacity: <br />15.70 <br />22.00 <br />18.85 <br />18.85 <br />LCY <br />LCY <br />LCY <br />LCY <br />CIRCES Cost Estimating Software <br />