Laserfiche WebLink
Continued... <br /> Appendix M.8 is not a required test, but TRI Environmental provides those results <br /> as part of their testing program. The 5 percent and ultimate tests are the tests <br /> that must meet the Technical Specifications. <br /> Please do not hesitate to contact me at 303-975-2192 or Andrea.Meduna@amecfw.com with <br /> any questions. <br /> Sincerely, <br /> Amec Foster Wheeler Environment & Infrastructure, Inc. <br /> Q$�N)0 LIC�ya, <br /> rrrrrrrrr <br /> Qr p, L.MFO:�d <br /> 0 s <br /> jo N Ar�r �l <br /> l` <br /> Andrea L. Meduna, PE <br /> Project Manager/Certifying Engineer <br /> Attachments: <br /> Squaw Gulch VLF Phase 1 (9,450' to 9,550' Bench) ROC and USB Flash Drive <br /> Cc: Mr. Ron Roberts, Project Manager, CC&V <br /> Mr. Ron DiDonato, Project Superintendent, CC&V <br /> Mr. Jeff Gaul, Project Superintendent, CC&V <br /> Mr. Chris Hanks, Chief Environmental Coordinator, CC&V <br /> Mr. Marc Tidquist, Sr. Environmental Coordinator, CC&V <br /> Ms. Meghan Duck, Document Control, CC&V <br /> Ms. Katie Holybee, Document Control, CC&V <br /> Mr. Robert Redd, Project Resident, Amec Foster Wheeler <br /> Amec Foster Wheeler Environment & Infrastructure, Inc. <br /> 2000 S. Colorado Blvd., Suite 2-1000 <br /> Denver, CO 80222 <br /> Tel: (303) 935-6505 <br /> Fax: (303) 935-6575 <br /> amecfw.com Page 5 <br />