1. <br /> CRIPPLE CREEK & VICTOR GOLD MINING Co. <br /> ANGLOGOLD ASHANTI (COLORADO) amec <br /> SQUAW GULCH (VLF) WEEKLY REPORT foster <br /> wheeler <br /> road between approximately stations L6+00 and L10+00, Squaw Gulch between approximately <br /> stations L6+00 and L10+00, and in the vicinity of the PSSA toe berm. <br /> A Cat 330 excavator with attached rock hammer was used to break up oversized Structural Fill <br /> material. <br /> The Structural Fill material was placed and compacted per the project specifications. <br /> One JD 670G excavator rough graded the Phase 2 slopes upslope of approximately stations <br /> M30+00 through M38+00. <br /> GPS equipped D6 dozers finish graded the slopes downslope of access road stations 86+00 <br /> through 88+00, the slopes upslope of stations L8+00 and L10+00, and the PSSA toe berm/ADR <br /> access ramp <br /> One dozer rough graded the slopes in the general vicinity between stations H28+00 and J10+00. <br /> Subgrade: <br /> The following Phase 1 subgrade area was compacted per project technical specifications to <br /> finished grade, inspected, and certified for SLF placement: <br /> Between approximate stations A2+00 to Al2+00 and C2+00 to C12+00. <br /> See attachment for the subgrade acceptance map for all accepted subgrade locations. <br /> Soil Liner Fill: <br /> Soil Liner Fill (SLF) processing continued periodically at the Cameron Site. <br /> Began the haul and placement of the SLF material at the end of the reporting period. One <br /> excavator loaded multiple Cat 740 haul trucks with the SLF material from the Midway stockpile. <br /> The material was placed on the A bench (9,450 elevation) between approximately stations A2+00 <br /> through Al2+00. The SLF was spread in a horizontal lift using one Cat D6 dozer. The material <br /> was not being placed as an engineered compacted SLF at this point in time but rather being <br /> stockpiled along the bench for future placement and compaction on the slope above the A bench. <br /> Spent Ore: <br /> Front-end loaders loaded Cat 740 haul trucks with previously stockpiled Spent Ore from the east <br /> quadrant of the PSSA. The material was hauled approximately 800' south within the PSSA <br /> footprint and spread with Cat Dozers in an approximately 20' lift to finish the 150' horizontal <br /> distance north and east of the HVSCS riser pipes on the ADR2 platform. <br /> A GPS equipped D6 dozer finish graded the area north of the PSSA's High Volume Solution <br /> Collection System riser pipes. <br /> One Cat D6 dozer graded an area in the vicinity of the east quadrant of the PSSA for a future <br /> LLDPE liner laydown yard. <br /> Underdrain System: <br /> Primary Underdrain: Complete. <br />