My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-12-03_GENERAL DOCUMENTS - M1977036
DRMS
>
Day Forward
>
General Documents
>
Minerals
>
M1977036
>
2015-12-03_GENERAL DOCUMENTS - M1977036
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/12/2020 2:28:39 AM
Creation date
12/3/2015 11:51:49 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977036
IBM Index Class Name
General Documents
Doc Date
12/3/2015
Doc Name
IMP CLOSEOUT FILE
From
DRMS
To
DRMS
Email Name
SDT
Media Type
D
Archive
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
289
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ROADABLE EQUIPMENT sheet 2 of 2 <br /> Machine Total Fleet Size Haul Trip Return Trip <br /> Description Cost/hour/unit (No. units) Cost/hr/fleet Cost/hr/fleet <br /> Subtotals : $0.00 $0.00 <br /> EQUIPMENT HAUL DISTANCE and TIME <br /> Nearest major city or town within project area region : Greeley Colorado <br /> Transportation Cycle Time : Non- Total one-way travel distance : 3.0 miles <br /> Roadable Roadable Average travel speed : 45.0 mph <br /> Equipment Equipment <br /> Haul time(hours) = 0.07 0.07 Total non-roadable mob/demob cost*: $8,371.79 <br /> Return time(hours) = 0.07 0.07 *two round trips with haul rig <br /> Loading time(hours) = 1.00 NA Total roadable mob/demob cost** : $0.00 <br /> Unloading time(hours) = 0.50 NA **one round trip,no haul rig <br /> Subtotals= 1.63 0.13 <br /> JOB TIME AND COST Total job time : 3.27 hours <br /> Total job cost: $8,372 <br />
The URL can be used to link to this page
Your browser does not support the video tag.