Laserfiche WebLink
CIRCES Cost Estimating Software <br /> EQUIPMENT MOBILIZATION / DEMOBILIZATION <br /> PROJECT IDENTIFICATION sheet 1 of 2 <br /> Agency or organization name:Colorado Division Of Reclamation, Mining And Safety <br /> Task#: 010 State :Colorado Permit/job#:M-1977-036 <br /> Date : 0112512010 County :Weld Abbreviation :none <br /> User: JLE Site :Greeley 35Th Avenue Mine Filename:M036-010 <br /> Permit or other job action :Warranty Estimate <br /> Task description :Mobilization and Demobilization of Equipment <br /> :::::: <br /> _. <br /> .......... .... . .._...... ........ . ...... . ...........,....,....,.,....... <br /> EQUIPMENT TRANSPORT RIG COST Shift basis : 1 per day <br /> Cost data source : CRG Data <br /> Truck tractor description :Generic on-highway truck tractor, 6x4, diesel powered, 400 HP(2nd half, 2006) <br /> Truck trailer description :Generic folding gooseneck, drop deck equipment trailer(25T, 50T, and 100T) <br /> Available rig capacities : 0-25 Tons 26-50 Tons 51+Tons <br /> Cost Breakdown : Ownership cost/hour: $16.63 $18.37 $22.33 <br /> Operating cost/hour: $44.38 $46.13 $50.07 <br /> Operator cost/hour: $27.66 $27.66 $27.66 <br /> Helper cost/hour: $0.00 $25.39 $25.39 <br /> Total Unit Cost/hour: $88.67 $117.55 $125.45 <br /> .... .. . .. __. <br /> NON-ROADABLE EQUIPMENT <br /> Machine Weight/unit Ownership Haul Rig Fleet Size Haul Trip Return Trip DOT permit <br /> Description (Tons) Cost/hr/unit Cost/hr/unit (No. units) Cost/hr/fleet Cost/hr/fleet Cost/fleet <br /> -Cat D9R-9SU(2005) 66.73 $58.16 $125.45 2 $367.22 $250.90 $500.00 <br /> -Cat 627G w/push-pull 42.04 $68.97 $117.55 4 $746.10 $470.20 $1,000.00 <br /> -CAT 14H 2O.70 $41.79 $88.67 1 $130.46 $88.67 $250.00 <br /> -Water Tanker, 5,000Gal. 15.00 $24.58 $88.67 1 $113.25 $88.67 $250.00 <br /> Subtotals : $1,357.02 $898.44 $2,000.00 <br />