Laserfiche WebLink
Spoil pile: <br />0.800 <br />(FND-RF) <br />Push gradient: <br />1.225 <br />(CAT HB) <br />Altitude: <br />1.000 <br />(CAT HB) <br />Material Weight: <br />0.868 <br />(CAT HB) <br />Blade type: <br />1.000 <br />(PAT) <br />Net correction: 0.4766 <br />Adjusted unit <br />production: <br />Adjusted fleet <br />production: <br />JOB TIME AND COST <br />450.86 LCY/hr <br />901.72 LCY/hr <br />Fleet size: 2 Dozer(s) <br />Unit cost: $0.810/LCY <br />Total job time: <br />Total job cost: <br />79.85 Hours <br />$58,346 <br />