Laserfiche WebLink
Task description: Regrade Rail <br />Site: Hayden Gulch Loadout <br />PROJECT IDENTIFICATION <br />Task #: 001 <br />Date: 11/19/2015 <br />User: JHB <br />BULLDOZER WORK <br />Permit Action: MT5 <br />State: Colorado <br />County: Routt <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />Basic Machine: <br />Cat D10T - IOSU <br />Horsepower: <br />574 <br />Blade Type: <br />Semi -Universal <br />Attachment: <br />3 -shank ripper <br />Shift Basis: <br />1 per day <br />Data Source: <br />(CRG) <br />Cost Breakdown: <br />NA <br />Permit/Job#: C1992081 <br />Abbreviation: None <br />Filename: C81-001 <br />Loose volume: 72,000 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell Cat Handbook <br />factor: <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjusted hourly <br />production: <br />200 feet <br />946.0 LCY/hr <br />Materials consistency description: Compacted fill or embankment 0.9 <br />Average push <br />gradient: <br />Average site altitude <br />-10% <br />6,400 feet <br />Material weight: 2,650 lbs/LCY <br />Weight description: Decomposed rock - 25% Rock, 75% Earth <br />Job Condition Correction Factor Source <br />Operator Skill: <br />Material consistency: <br />Dozing method: <br />Visibility: <br />Job efficiency: <br />0.750 <br />(AVG.) <br />Utilization % <br />Ownership Cost/Hour: <br />$131.86 <br />NA <br />Operating Cost/Hour: <br />$184.48 <br />100 <br />Ripper op. Cost/Hour: <br />$11.02 <br />100 <br />Operator Cost/Hour: <br />$38.01 <br />NA <br />Total unit Cost/Hour: $365.36 <br />Total Fleet Cost/Hour: $730.72 <br />MATERIAL QUANTITIES <br />Initial Volume: 64,000 <br />Swell factor: 1.125 <br />Loose volume: 72,000 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell Cat Handbook <br />factor: <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjusted hourly <br />production: <br />200 feet <br />946.0 LCY/hr <br />Materials consistency description: Compacted fill or embankment 0.9 <br />Average push <br />gradient: <br />Average site altitude <br />-10% <br />6,400 feet <br />Material weight: 2,650 lbs/LCY <br />Weight description: Decomposed rock - 25% Rock, 75% Earth <br />Job Condition Correction Factor Source <br />Operator Skill: <br />Material consistency: <br />Dozing method: <br />Visibility: <br />Job efficiency: <br />0.750 <br />(AVG.) <br />0.900 <br />(CAT HB)) <br />1.000 <br />(GEN_) <br />1.000 <br />(AVG.) <br />0.830 <br />(1 SHIFT/DAY) <br />