Laserfiche WebLink
Robin Reilley, DRMS <br />Page 2 <br />November 16, 2015 <br />results will be located in Appendix 8(6). This appendix does not appear to be included <br />with the TR26 submittal. Given this, the operator will need to provide the information <br />required by Rule 2.04.9 — Soil Resource Information, for the proposed disturbed area of <br />the monitoring wells clusters. <br />• Based on the soils information to be submitted; as discussed in the item above, the <br />operator will need to submit a soil handling plan to be included in section 2.05.4 of the <br />permit in accordance with Rule 2.05.4(2)(4). This shall include a plan for the removal, <br />storage and redistribution of topsoil, subsoil and other material to meet the requirements <br />of Rule 4.06. <br />Reclamation Cost Estimate <br />I have begun a reclamation cost estimate for the proposed project, however I will need the <br />permittee to address the adequacy review issues regarding the topsoil handling and reclamation <br />plan in order to complete the reclamation cost estimate. <br />