Laserfiche WebLink
1'-7 1/2„ <br /> 1 -3 1/2 1/4 BEARING PLATE TO <br /> FLANGE OF WT <br /> DOUBLE NUTS ABOVE BEARING 0 0 13 16"0 LONG SLOTTED HOLE IN <br /> O O PLATE BOTTOM FLANGE OF MAIN BEAM, <br /> ALIGNED WITH BEAM LENGTH FOR <br /> THERMAL GROWTH ALLOWANCE <br /> SPREADER PLATE !J MOLYBDENUM BASED PERMANENT <br /> ——— -SEE 4/S4.5 a LUBRICANT, TEFLON PAD OR EQUAL, <br /> G 1 3/4° <br /> BETWEEN MAIN BEAM AND PLATE <br /> DOUBLE NUTS ABOVE STIFFENED 3/4"x4"x8" STAINLESS STEEL BEARING <br /> CONNECTION, SHOP INSTALLED AND SHIM PLATE, EACH BEAM, WITH (1) <br /> Q -DELIVER TO SITE WITH THREADED 13/16"0 HOLE FOR 3/4"0 A325 BOLT, <br /> RODS PROJECTING d LOCATE BOLT AT CENTER OF SLOT <br /> C 1/4 WT FLANGE AND WEB <br /> d FITTED STIFFENER PLATES ON d!b1/4 TO CHANNELS, TYP. <br /> CHANNEL AT HANGER RODS, WELD a 4„ BEARING SUPPORT FOR NEW MAIN <br /> ALL AROUND WITH 3/16" FILLETS BEAMS, HOLD DOWN 1/4" FOR <br /> 4 -SEE 4/S4.5 N WELD SURFACE AT TOP <br /> Nztj -SEE 1/S4.4 <br /> ar BACKER PLATE ON CHANNEL 1 -1 <br /> q c CENTERED ON HANGER RODS a <br /> 1/2"x8"x1'-2", WITH 3/8" FILLET WELDS <br /> FOUR SIDES <br /> a ANGLE TO CHANNEL <br /> 3/4"0 x 6" GALVANIZED HILTI KWIK 1/4 TWO SIDES <br /> a a BOLT 3 WITH N. 4" EMBEDMENT <br /> 4 END ANGLE AT BOT. OF CHANNELS, <br /> WASHER PLATE TO HOLD TIGHT TO FACE OF CONCRETE <br /> 3/16 CHANNEL AFTER FINAL a n PEDESTAL (NO CONN. TO CONCRETE) <br /> POSITIONING -SEE 1/S4.4 <br /> 5A SECTION AT HANGER RODS 5g SECTION AT SIDE OF MIDDLE PEDESTAL <br /> S4.5 S4.6 NOTES- 1 1/2" = 1'-0" S4.5 S4.6 NOTE: 1 1/2" = 1'-0" <br /> 1. SEE 3/S4.5 FOR ADDITIONAL INFORMATION AND REQUIREMENTS. 1. AT SIMILAR ONE SPAN CONDITION, EXTEND MAIN BEAM TO BEAR ON <br /> 2. SEE 2/S4.9 FOR ADDITIONAL REQUIREMENTS AT TOWER 7. CENTER OF PEDESTAL, WITH CONN. BOLT AT CENTER OF WT. SEE <br /> DETAIL 5C/S4.6.1 FOR ADDITIONAL INFORMATION. <br /> DWG.NO. REFERENCE DRAWINGS DESCRIPTION OF REVISION DATE BY VENTILATION ENGR: JLK 2.2&14 � nCli =Molybdenum HENDERSON MILL <br /> MECHANICAL DRAM BY: JP 2.20-1a TAILINGS DELIVERY LINE <br /> 4 RECORD SET OF CONSTRUCTION COMPLETED N 2015 00 3-15 JLK STRUCTURAL CHECKED BY: JCB 2-2B-14 AF19Bp0If-MCMORen COmpiny <br /> ELECTRICAL APPROVED BY: neiv nsuu.caor+wo bs-+ae.>a, BRACKET DETAILS <br /> PIPING APPROVED BY: pttAU ti..ASSOC:IATES <br /> SCALE: AS NOTED OTHER APP BY: <t: 11 n i r:11 1 a PROD.NO.13021 ISHT S4.8 REV. 4 <br />