Laserfiche WebLink
AS BUILT, SHORTENED END OF BEAM AT <br /> UPHILL PEDESTAL OF TOWER 4 <br /> TYPICAL END OF BEAM AT UPHILL <br /> PEDESTAL <br /> BEARING PLATE TO <br /> 1/4 FLANGE OF WT <br /> O 13/16"0 LONG SLOTTED HOLE IN <br /> BOTTOM FLANGE OF MAIN BEAM, <br /> ALIGNED WITH BEAM LENGTH FOR <br /> THERMAL GROWTH ALLOWANCE <br /> MOLYBDENUM BASED PERMANENT <br /> LUBRICANT, TEFLON PAD OR EQUAL, <br /> la BETWEEN MAIN BEAM AND PLATE <br /> I <br /> Id 3/4"x4"x8" STAINLESS STEEL BEARING <br /> AND SHIM PLATE, EACH BEAM, WITH (1) <br /> 13/16"0 HOLE FOR 3/4"0 A325 BOLT, <br /> 4 a LOCATE BOLT AT CENTER OF SLOT <br /> I <br /> d <br /> 1/4 WT FLANGE AND WEB <br /> 1/2" 4^ 4 1/2 1/4 TO CHANNELS, TYP. <br /> BEARING SUPPORT FOR NEW MAIN <br /> BEAMS, HOLD DOWN 1/4" FOR <br /> 04 WELD SURFACE AT TOP <br /> -SEE 1/S4.4 <br /> a <br /> a ANGLE TO CHANNEL <br /> 1/4 TWO SIDES <br /> 1 -8 <br /> END ANGLE AT BOT. OF CHANNELS, <br /> HOLD TIGHT TO FACE OF CONCRETE <br /> a ° PEDESTAL (NO CONN. TO CONCRETE) <br /> -SEE 1/S4.4 <br /> sc SECTION AT SIDE OF UPHILL PEDESTAL <br /> S4.5 54.6.1NOTE: 1 1/2" = 1'-0" <br /> 1. AT SIMILAR ONE SPAN CONDITION, EXTEND MAIN BEAM TO BEAR ON <br /> CENTER OF PEDESTAL, WITH CONN. BOLT AT CENTER OF WT. <br /> DWG.NO. REFERENCE DRAWINGS DESCRIPTION OF REVISION DATE BY VENTILATION ENGR: JLK 1 2.25.14 J%fg__CMolybdenum HENDERSON MILL <br /> MECHANICAL DRAWN BY: JP 2s8-14 TAILINGS DELIVERY LINE <br /> MSET RUCTION COMPLETED IN 2015 1 00 3-15 1 JLK STRUCTURAL CHECKED BY: JC8 2-8-14 A f/lippf-�fCMDRBII COTp�ny <br /> ELECTRICAL APPROVED BY: vu,s,wi arauoo <br /> BRACKET DETAILS <br /> PIPING APPROVED BY, RAUR&.11-SMIATES <br /> SCALE AS NOTED OTHER APP BY: PROJ.NO.13024 ISHT S4.8.1 REV. 4 <br />