Laserfiche WebLink
Mr. Jones <br />Page 14 <br />November 12, 2015 <br />addressed under the Reclamation Plan. In addition, the financial warranty will include a <br />component for stabilization and revegetation of this area. In order for the Division to approve <br />this activity, the following information must be provided: <br />a) Specify the timing of creating the fire break. <br />b) Specify how the area will be stabilized to prevent erosion. <br />c) Specify how the area will be revegetated. <br />d) Specify the timing of reclamation on this area. <br />e) Specify the dimensions and gradient of the fire break. <br />19. The Existing Disturbances Map states there are previous disturbances consisting of shafts, <br />closed adits and tailings. As required by Rule 6.3.5(2)(f), please revise the map so that the <br />existing disturbances are outlined. <br />20. The Reclamation Plan Map states that the total area requiring reclamation is estimated to be <br />1.0 acres. However, Exhibit E — Map 1 states the total area requiring reclamation is estimated <br />to be 1.1 acres. Please clarify this discrepancy and revise the appropriate map accordingly. <br />Also, please see additional comments under Item No. 18 in regards to areas requiring <br />reclamation. <br />21. The Reclamation Plan Map does not include an outlined and labeled permit boundary. <br />Pursuant to Rule 6.2.1(2), maps must identify and outline the permit boundary. Please <br />provide a Reclamation Plan Map with an outlined and labeled permit boundary. <br />22. The Applicant has provided several maps to depict the required information for the Mining <br />Plan Map. At least one Mining Plan Map must include an outlined and labeled permit <br />boundary with all the major components of the mining operation outlined and labeled. This <br />would include the access road, the trench, stockpiles and processing area. Please revise one <br />of the Mining Plan Maps to include the above listed elements. Also, please see additional <br />comments under Item No. 16. <br />6.3.6 Exhibit F — List of Other Permits and Licenses Required <br />23. The Applicant has indicated they are working with the Water Quality Control Division to <br />determine if a stormwater discharge permit is needed. Please commit to following their <br />recommendations and provide the Division with a copy of the stormwater discharge permit if <br />it is required. Please see additional comments under Item No. 3. <br />24. The Applicant has indicated they are working with Clear Creek County to determine the <br />design standards for the access road. Please commit to following Clear Creek County <br />requirements for the construction of the access road. Since the access road is considered to be <br />affected area, the design details must be a component of the Reclamation Permit. The <br />Division may issue a Reclamation Permit independent of other agencies approvals. <br />