Report is approved. The purpose of the current operations is to begin to load the new SGVLF as <br /> preparation for production. Commencement of leach operations or placement of previously <br /> leached processed product above the level of the certified Process Solution Storage Area will be <br /> contingent upon certification of the above referenced certification report. <br /> Beginning in mid-November 2015 CC&V proposes to begin mix processed product from the <br /> HGM with fresh ore and place in into the PSSA. Approximately two 30 yard buckets of <br /> processed product will be added to each 240 ton load of fresh ore. <br /> The operation will require moving fresh ore mixed with processed tails a distance of 11,200 feet, <br /> of which 9,200 feet traverses unlined area. A map named"Fresh Ore/Processed Product <br /> Haulage Route.pdf' showing the designated route is attached. The truck loading location at the <br /> load out bin on the edge of Phase IV of AGVLF places the haulage equipment on clean road fill <br /> over certified liner on material uncontaminated by sodium cyanide. There will therefore not be a <br /> tracking issue for truck leaving the lined area. <br /> Equipment used will be a mix of CC&V Cat 793 haul trucks and Cat 992 or 993 loaders and/or <br /> equivalent contractor loader and haulage units from their respective fleets. Measures will be <br /> implemented to reduce volumetric loading to reduce the possibility of spillage of previously <br /> leached mill product. Additionally, the haulage route traversing unlined area while loaded with <br /> fresh ore and processed product primarily descends or is on the level, which further reduces the <br /> potential for spillage. <br /> The fresh ore is crushed rock having a product size of approximately 80%passing 3/a", having a <br /> moisture content of 6 - 7% and 12 pounds of line per ton, and the processed product 20% <br /> moisture/200 ppm of NaCN per dry ton of processed product. <br /> 2) Schedule and expected date of completion; <br /> The project is anticipated to commence in November 2015 and will continue throughout the life <br /> of SGVLF (approximately 2025). Operation will be seven days a week, 24 hours a day. <br /> 3) Map showing locations of removal and placement, route(s) and where routes are off <br /> edge of liner; <br /> Reference attachment"Fresh Ore/Processed Product Haulage Route.pdf' <br /> 4) Any change to the final configuration of the AGVLF ; <br /> Phase IV of the AGVLF where the load out bin and processed product conveyor from the HGM <br /> will not be altered. There will be no change to the final configuration of AGVLF. <br /> 5) Any change to the AGVLF reclamation plan; <br /> No <br />