Laserfiche WebLink
J&T Consulting, Inc. <br />Bond Quantities and Costs <br />Summary of Unit Costs <br />Direct costs <br />Re -applying topsoil 12" thick <br />Revegetatmg disturbed area <br />Dewatering full pit <br />Slurry Wali Cost (75 foot average depth) <br />0-50 R @ SM -51-7017@$4117- 71-75 R Q $1641) <br />Scarifying Ground <br />Mobilization <br />Journey Ventures, <br />1,800.00 / acre <br />1,000.00 / acre <br />400.00 / million gallons <br />310.00 / linear foot <br />200 / acre <br />2,500 lump sum <br />Journey Ventures f <br />9/8/201 <br />Overburden Placement <br />Hauling and placement of overburden 0.50 cubic yard <br />Blending and moisture conditioning 0.50 cubic yard <br />Compaction to desired density 1.00 cubic yard <br />QA/QC 0.25 cubic yard <br />Total Overburden Placement Cost 2.25 cubic yard <br />Overhead and Profit Costs <br />Liability insurance 1.55% of direct cost <br />Performance bond 1.05% of direct cost <br />Profit 10.00% of direct cost <br />Total Overhead Cost 1260% of direct cost <br />Project Management <br />Engineering and bidding 4.25% of direct cost <br />Management and administration 5.00% of direct cost <br />Total Additional Cost 9.25% of direct cost <br />1 of 6