Laserfiche WebLink
QUARTERLY SEDIMENTATION POND INSPECTION REPORT <br />CDMR Rule 4.05.9(17) <br />Mine: New Elk <br />NPDES ID. No.: <br />Inspection Period- <br />Inspection Date: <br />Pond #8 <br />Third Quarter 2015 <br />09/30/15 <br />General Description or Reference to Site Plan: <br />This pond lies north of Highway 12 at the base of the refuse disposal area. The pond receives <br />run-off from the refuse disposal area. <br />EMBANKMENT <br />1). Adequacy of the vegetative cover:�xcellentModerate Few Poor <br />2). Erosion forming Gullies: Extensive Some Few None <br />3). Is wave action causing erosion: <br />On the Upstream embankment? <br />At the principal spillway inlet? <br />4). Erosion of the downstream toe of the embankment? <br />Cause of erosion can be attributed to: <br />Yes No <br />Yes No >~ <br />Yes No <br />5). Is seepage occurring through the dam? Yes <br />Could this seepage cause potential instability? <br />PRINCIPAL SPILLWAY <br />1). Is the principal spillway system in working order? <br />2). Is the inlet free of debris and restrictive material? <br />3). Is the discharge outlet free of restrictive material? <br />4). Is erosion occurring at the discharge outlet? <br />Evaluate the severity: Extensive Moderate <br />Yes V1"" <br />Yes _V <br />Yes t/ <br />Yes <br />Just starting <br />No 1� <br />No <br />No <br />No <br />No t. <br />None <br />