Laserfiche WebLink
New Elk Mine <br />9/30/2015 <br />EMERGENCY SPILLWAY <br />1). Does it appear that the emergency spillway has discharged water since the last inspection? <br />Yes No A <br />2). Is erosion occurring at any section of the emergency spillway? <br />Yes <br />Describe extent: <br />SEDIMENT STORAGE CAPACITY <br />1). Has the design storage capacity of the reservoir been surpassed? <br />Yes _ <br />Explain: <br />OTHER OBSERVATIONS <br />ei* tet`' 5 <br />No <br />No A— <br />V, V, <br />M <br />��/ U c-ai <br />C4n <br />MSHA QuaFried Impou dment In pector <br />Date <br />Page 2 of 2 <br />-r <br />