Laserfiche WebLink
King Coal Mine (C-1981-035) TR -25 Adequacy Review 41 Response <br />c. Elevations for the pond drawing. <br />Font size has been increased as reauested. <br />d. Also, make sure pond elevations are legible by placing text on top of other layers <br />or lines. <br />Text layers have been arranged as requested. <br />8. Please call out and label the top of embankment elevation on the pond, maybe show <br />with a heavier line. <br />The top of embankment elevation of the pond is called out and labelled and appears with a <br />heavier line. <br />Rule: 4.03(4) Drainage and Culverts <br />The general requirements of this section include: <br />o The ability of culverts to pass the 10 year 24 hour rain event. <br />o Are constructed to avoid collapse and erosion at inlets and outlets <br />o Accommodate flow from intersecting drainages. <br />The general requirements of this section have been adequately met in the permit. I may have additional <br />questions when I can verify designs through SedCad. <br />GCC Enerav will respond if and when additional auestions are submitted. The SedCad section has <br />been replaced with an updated version. <br />Kinq II Ditch Capacities, Drainage Basins <br />9. Please confirm that the table King II Ditch Capacities provided in the TR25 packet <br />replaces the table in the permit Appendix 11 (1) King II Ditch Capacities dated March <br />2010 as a revised page <br />The information submitted with TR -25 will replace the entire contents of Appendix 11. Revised <br />Table of Contents pages iii and iv are attached to depict chances associated with TR -25. <br />10. Please confirm that Appendix 3A King II Ditch Capacities dated 2009 is no longer <br />relevant information. <br />See #9 above. <br />11. Please confirm that the table King II Drainage Basins provided in the TR25 packet <br />replaces the table in the permit Appendix 11 (2) King II Basin Flows dated 2009 as a <br />revised page. <br />See #9 above. <br />Culvert Capacities <br />12. Please confirm that the table Culvert Capacities provided in the TR25 packet replaces <br />the table in the permit Appendix 11 (3) King Culvert Capacities dated March 2009. <br />See #9 above. <br />13. The table indicates that culvert C14 flows from ID -3. I was unable to locate ID -3 on the map. <br />Please make sure ID -3 is located on the map. <br />ID -3 is not shown on the map and has been removed from the table. <br />14. The table indicates that culvert C10 flows from D. I believe that might refer to Basin D. Please <br />clarify what D stands for and label it as such in the "Flows From" field in the Culvert <br />Capacities table. <br />An additional table "Flow Schedule" has been created to include in the report which lists "flows to" <br />locations for each ditch and culvert. The "Flows From" field has been removed <br />15. Ibid for culvert C-17 and for culvert C-20. <br />See 14 above. <br />